For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
Patterson Road Sidewalk Project
CML-5255(064)
City of Riverbank
Riverbank, Stanislaus County, CA
03/14/2024 at 11:00
FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following scopes of work, including but not limited to: Mobilization, Erosion Control, Traffic Control, Sawcut/Demo/Off Haul Median, Sawcut/Demo/Off Haul Curb And Gutter, Sawcut/Demo/Off Haul Concrete Hardscape, Sawcut/Demo/Off Haul Ada Ramp Including Curb And Gutter, Sawcut/Demo/Off Haul Driveway Entrance, Sawcut/Demo/Off Haul Concrete Stairs And Subbase, Sawcut/Demo/Off Haul Asphalt & Base Rock: Depth 4", Sawcut/Demo/Off Haul Asphalt & Base Rock: Depth 6", Sawcut/Demo/Off Haul Asphalt & Base Rock: Depth 9", Sawcut/Demo/Off Haul Concrete & Base Rock: Depth 6", Remove Stop Sign, And Post, Remove Yield Right Sign, And Post, Remove Chainlink Fence, Remove Wheel Blocks, Grind Stop Bar, Remove Brick Mow Strip, Remove Storm Drain Grate And Frame, Aggregate Base, Class Ii (2,897 Sf) 6" Depth, Aggregate Base, Class Ii (635 Sf) 4" Depth, Asphalt Concrete Paving (2,897 Sf) 3" Depth, Asphalt Concrete Paving (635 Sf) 2" Depth, Ada Type A Ramp Curb Return Including Truncated Domes #1, Ada Type A Ramp Curb Return Including Truncated Domes #2, Ada Type A Ramp Curb Return Including Truncated Domes #3, Ada Type A Ramp Curb Return Including Truncated Domes #4, Ada Type A Ramp Curb Return Including Truncated Domes #5, Ada Type A Ramp Curb Return Including Truncated Domes #6, 4" P.C.C. Sidewalk 4 Ft Width, 4" P.C.C. Sidewalk 4.5 Ft Width, 4" P.C.C. Sidewalk 5 Ft Width, 6" P.C.C. Sidewalk 5 Ft Width, 6" P.C.C. Median Infill, 6" P.C.C. Transition Hardscape, Roll-Over Curb & Gutter, 6" Vertical Curb & Gutter, Curb Transition, Vertical To Roll-Over, 6" Median Curb, 12" Vertical Curb, Driveway Apron, 3'X5' Wet-Set Truncated Domes, Valley Gutter, Handrailing, Stop Sign And Post, Thermoplastic Single Solid 12" Line, White, Thermoplastic Double Solid 4" Line, Yellow, Thermoplastic Single Solid 4" Line, White, Thermoplastic Ladder Crosswalk, White, Landscape Infill And Repair - All Locations, Adjust Water Valve To Grade, Install New Water Meter Box And Adjust To Grade, Adjust Storm Manhole To Grade, Adjust Storm Catch Basin Grate To Grade, Relocate Hydrant To Back Of Walk, Hydrant Thrust Block
A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available for download at the Caltrans website at the following link: https://qap.questcdn.com/qap/projects/prj_browse/ipp_browse_grid.html?projType=all&provider=7255714&group=725571. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Danielle Whitelaw
Marcus Hanson (mhanson@vc-inc.net)
Telephone
(925) 245-1300
(925) 245-1244
Address
550 Greenville Road
Livermore, CA 94550
The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »