DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Bolinas Lagoon Wye Wetland Resiliency Project in Bolinas


Bid/Contract #

2023-42


Awarding Agency

County of Marin


Project Location

Bolinas, Marin County, CA


Bid Date

05/13/2024 at 10:00


Project Details

INVITATION TO BID

Owner: County of Marin
Bid Date & Time: 5/13/24 @ 10:00 AM
Project: #2023-42 " Bolinas Lagoon Wye Wetland Resiliency Project in Bolinas

Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for construction (remove crossroads, restore tidal wetlands, relocate intersection, realign roadway with new bridge, reroute creek, install of large wood structure, repair bank failure) on Olema Bolinas Roadway and Lewis Gulch Creek. Quotes requested include, but are not limited to, the following scopes of work: FABRIC & OILS, MATERIAL SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, COLD PLANE, CLEAR & GRUB, ROADWAY EXCAVATION, IMPORTED BORROW, EROSION CONTROL, AGGREGATE BASE, ASPHALT PAVING, CIDH PILES, PRESTRESSING CONCRETE CAST-IN-PLACE, STRUCTURAL CONCRETE, JOINT SEAL, ROADSIDE SIGNS, ALTERNATIVE PIPE CULVERT (UNDERGROUND), ROCK SLOPE PROTECTION, METAL BEAM GUARD RAILING, METAL RAILING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, SURVEYOR, SWPPP PLANNING, SWEEPER, TRUCKER, TEMPORARY CREEK DIVERSION SYSTEMS, ROADSIDE CLEARING (TREE REMOVAL), WILLOW CUTTING (BANK STABILIZATION), 74” PERMANENT STEEL CASING, LOG STRUCTURE (BANK STABILIZATION), & LOG STRUCTURE (CHANNEL AND FLOODPLAIN). Engineer's Estimate: $4,960,336 / DBE Goal: 15% / 240 WD / $6,700 per calendar day LD. Submit quotes by 8:00AM on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.


Mr. Joe Armenta (707/800-5246 or joea@ghilotti.com) is the Estimator for this project and is available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: GCC may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. GCC will pay bond premiums up to 1 ½% of contract cost. GCC is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)

Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be downloaded for free through the County of Marin via their website at https://www.bidexpress.com/businesses/53528/home. Plans may also be viewed or purchased through local plan rooms, builder’s exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

Project Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work.
Subcontract Requirements: Subcontractors will be required to execute GCC’s written subcontract. A copy is available for inspection on GCC’s website: https://www.ghilotti.com/subcontractors/ and/or can be provided upon written request prior to bid submission. By submitting your bid, you agree that all Inconsistent Terms and Conditions contained in your bid shall be disregarded and the Terms and Conditions of the GCC standard subcontract shall control. “Inconsistent Terms and Conditions” is defined as any terms and conditions that may be attached to your bid other than the price and scope that are inconsistent or conflict with the Terms and Conditions of GCC’s standard subcontract.

Union: GCC is a UNION CONTRACTOR. Non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.
Insurance:
• All bids must include compliance with GCC’s Addendum A, located at: https://www.ghilotti.com/wp-content/uploads/2022/12/Addendum-A-Revised-3-2022.pdf
• CGL limits of $5,000,000/occurrence at a minimum (depending on scope)
• GCC and Owner must be named as additional insured on CGL & Auto policies (form CG 20 10 11/85 or equivalent)
• Completed operations coverage
• Primary and non-contributory wording
• Waiver of subrogation on both CGL & WC policies
• Any additional costs to meet this requirement must be included in bid pricing.

***WE ARE AN EQUAL OPPORTUNITY EMPLOYER***

GHILOTTI CONSTRUCTION COMPANY, INC.
246 GHILOTTI AVENUE
SANTA ROSA, CA 95407
PH: (707) 585-1221 * FX: (707) 585-1601

Get in Touch

Outreach Coordinator

Estimating Department


Project Estimator

Mr. Joe Armenta (707/800-5246 or joea@ghilotti.com)

Telephone

(707) 585-1221


Fax

(707) 585-1601

Address

246 Ghilotti Ave
Santa Rosa, CA 95407


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »