DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Construct slope paving (stamped concrete) and rock blanket


Bid/Contract #

06-0X7804


Awarding Agency

California Department of Transportation


Project Location

Freson, Fresno County, CA


Bid Date

02/01/2024 at 02:00


Project Details

FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following scopes of work, including but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute, Resolution Advisor On-Site Meeting, Hourly Off-Site Dispute-Resolution- Advisor-Related Tasks, Construction Area Signs, Traffic Control System, Temporary Traffic Stripe (Tape), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System Day, Temporary Pavement Marker, Temporary Barrier System, Portable Changeable Message Sign (Ls), Temporary Crash Cushion Module, Alternative Temporary Crash Cushion Tl-3, Temporary Radar Speed Feedback Sign System, Job Site Management, Stormwater Pollution Prevention Plan, Storm Water Annual Report, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Remove Yellow Painted Traffic Stripe (Hazardous Waste), Treated Wood Waste, Clearing And Grubbing (Ls), Rock Blanket, Maintain Existing Planted Areas, Wood Mulch, Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Control And Neutral Conductors, Pop-Up Sprinkler Assembly (Gear Driven), Pop-Up Sprinkler Assembly 2" Gate Valve, 3/4" Plastic Pipe (Schedule 40) (Supply Line), 1" Plastic Pipe (Schedule 40) (Supply Line), 1 1/4" Plastic Pipe (Schedule 40) (Supply Line), 1 1/2" Plastic Pipe (Schedule 40) (Supply Line), 2" Plastic Pipe (Class 315) (Supply Line), 8" Welded Steel Pipe Conduit, Fiber Rolls, Minor Hot Mix Asphalt, Place Hot Mix Asphalt Dike (Type C), Remove Asphalt Concrete Dike, Repair 30" Cast-In-Place Concrete Pipe, Slope Paving (Stamped Concrete), Remove Pavement Marker, Pavement Marker (Retroreflective), Remove Roadside Sign, Remove Roadside Sign (Strap And Saddle Bracket Method), Reset Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Transition Railing (Type Wb-31), End Cap (Type A), End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal Tl-3, Alternative Crash Cushion Tl-3, Concrete Barrier (Type 60M), Concrete Barrier (Type 60Sd), Remove Guardrail, Remove Concrete Barrier, Remove Crash Cushion, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Painted Traffic Stripe, Maintaining Existing Traffic Management System Elements During Construction, Traffic Monitoring Station System, Modifying Lighting Systems, Modifying Ramp Metering Systems, Removing Traffic Monitoring Stations Mobilization


A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available for download at the Caltrans website at the following link: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=06-0X7804. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

Get in Touch

Outreach Coordinator

Danielle Whitelaw


Project Estimator

Jason Muller (jmuller@vc-inc.net)

Telephone

(925) 245-1300


Fax

(925) 245-1244

Address

550 Greenville Road
Livermore, CA 94550


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »