DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Citywide Sidewalk Repair Project Phase II


Bid/Contract #

CIP No. 9720


Awarding Agency

City of Salinas


Project Location

Salinas, Monterey County, CA


Bid Date

01/16/2024 at 02:00


Project Details

FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following scopes of work, including but not limited to: Construction Coordination / Mobilization, "Furnish And Install Traffic Control And All Construction Area Signs And Hardware (Including Removal At End Of Project), Complete-In-Place" Implement Erosion And Sediment Control Plan; Complete-In-Place "Furnish And Install 15-Gallon Tree (Including 180 Calendar Day Type II Plant Establishment And Maintenance Period), Complete-In-Place" Remove And Dispose Existing Tree, Grind Tree Stump To 36” Below Grade; Complete-In-Place Remove And Dispose Existing Tree Stump To 36” Below Grade; Complete-In-Place
Remove And Dispose Of Existing Concrete Curb And Gutter, Construct Type “C” Concrete Curb And Gutter, Remove And Dispose Of Existing Concrete Heavy Duty Curb And Gutter, Construct Concrete Type “C” Heavy Duty Curb And Gutter, Remove And Dispose Existing Concrete Sidewalk
Construct Concrete Sidewalk, Construct Ada Pedestrian Curb Ramp “Case A” Caltrans Standard, Construct Ada Pedestrian Curb Ramp “Case B” Caltrans Standard, Construct Ada Pedestrian Curb Ramp “Case C” Caltrans Standard, Construct Ada Pedestrian Curb Ramp “Case D” Caltrans Standard,
Construct Ada Pedestrian Curb Ramp “Case E” Caltrans Standard, Construct Ada Pedestrian Curb Ramp “Case F” Caltrans Standard, Construct Ada Pedestrian Curb Ramp “Case G” Caltrans Standard, Relocate Existing Sign And Post, Grind Existing Sidewalk Lip Flush To Adjacent Sidewalk Scoreline,
Remove And Dispose Existing Concrete Residential Driveway Approach, Construct Concrete Residential Driveway Approach, Remove And Dispose Existing Concrete Commercial Driveway Approach, Construct Concrete Commercial Driveway Approach, Construction Coordination / Mobilization;
"Furnish And Install Traffic Control And All Construction Area Signs And Hardware (Including Removal At End Of Project), Implement Erosion And Sediment Control Plan; Furnish And Install 15-Gallon Tree (Including 180 Calendar Day Type II Plant Establishment And Maintenance Period),
Remove And Dispose Existing Tree, Grind Tree Stump To 36” Below Grade; Remove And Dispose Existing Tree Stump To 36” Below Grade;
Remove And Dispose Of Existing Concrete Curb And Gutter, Construct Type “C” Concrete Curb And Gutter, Remove And Dispose Of Existing Concrete Heavy Duty Curb And Gutter, Construct Concrete Type “C” Heavy Duty Curb And Gutter, Remove And Dispose Existing Concrete Sidewalk
Construct Concrete Sidewalk, Construct Ada Pedestrian Curb Ramp “Case A” Caltrans Standard, Construct Ada Pedestrian Curb Ramp “Case B” Caltrans Standard, Construct Ada Pedestrian Curb Ramp “Case C” Caltrans Standard, Construct Ada Pedestrian Curb Ramp “Case D” Caltrans Standard,
Construct Ada Pedestrian Curb Ramp “Case E” Caltrans Standard, Construct Ada Pedestrian Curb Ramp “Case F” Caltrans Standard, Construct Ada Pedestrian Curb Ramp “Case G” Caltrans Standard, Relocate Existing Sign And Post, Grind Existing Sidewalk Lip Flush To Adjacent Sidewalk Scoreline,
Remove And Dispose Existing Concrete Residential Driveway Approach, Construct Concrete Residential Driveway Approach, Remove And Dispose Existing Concrete Commercial Driveway Approach, Construct Concrete Commercial Driveway Approach.


A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available for download at the Caltrans website at the following link: https://pbsystem.planetbids.com/portal/22949/bo/bo-detail/111460. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

Get in Touch

Outreach Coordinator

Danielle Whitelaw


Project Estimator

Marcus Hanson (mhanson@vc-inc.net)

Telephone

(925) 245-1300


Fax

(925) 245-1244

Address

550 Greenville Road
Livermore, CA 94550


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »