For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
T-18 (Terminal 18) Shore Power
MC-0321853 / WP# U00670
Port of Seattle
Seattle, King County County, WA
09/16/2025 at 02:00
Shimmick Construction Company, Inc. welcomes quotes from certified subcontractors and suppliers on complete or partial portions of work, including (but not limited to) the following:
Contaminated Soil, Coring, Demolition, Dewatering, Earthwork, Electrical Supplies, Environmental, Erosion Control, Fencing, Horizontal Boring, Painting, Paving, Rebar, Stripes/Markers, Structural Steel, Trucking, Welding, Aggregate, Fabric, Precast Structural, Precast Utility, Ready Mix, Steel Fabrication, Trench Shoring
PROJECT DESCRIPTION: The T-18 (Terminal 18) Shore Power Project will install shore power at Berths 1 and 3 of T18. The scope of this project includes installing a new electrical feeder from Seattle City Light substation N1 to Berth 1. A new feeder will also be installed from Seattle City Light substation N2 to Berth 3. To install the new feeders, new conduit will need to be installed by means of trenching and horizontal directional drilling. New shore power substations will be installed at Berths 1 and 3. From the new substations, feeders will be installed to provide power to shore power vaults and outlets located on the pier's bull rail. Berth 1 will receive two shore power vaults and outlets, and Berth 3 will receive three shore power vaults and outlets. After completion of the shore power installation, the system will be tested and commissioned to ensure the system is functioning properly and as designed. The Terminal will continue active cargo operations during the duration of this Project.
PLANS AND SPECIFICATIONS: Plans and specifications are available via VendorConnect: https://hosting.portseattle.org/sops/#/Solicitations
You may also contact Jamie Miranda at jmiranda@shimmick.com for a download link or to set up a meeting via Teams to discuss the plans with an estimator. Meetings are held during regular business hours of 8am to 5pm.
SHIMMICK CONTACTS:
Dave Wirth, Lead Estimator, david.wirth@shimmick.com
Abraham Leon, Estimator, abraham.leon@shimmick.com
Jamie Miranda, Estimating Coordinator, jmiranda@shimmick.com
ADDITIONAL INFORMATION: 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. For assistance with bonding, insurance or lines of credit contact Todd Yoder at todd.yoder@shimmick.com.
This contract has a Project Labor Agreement.
All items of work listed above are made available, even items of work normally performed by Shimmick. Please contact the lead estimator for assistance with breaking down items of work into economically feasible units, assistance obtaining equipment, supplies, materials, bonding, insurance, estimating, or any additional assistance. Shimmick Construction's listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor's conditions or exceptions included with the Subcontractor's price quote.
QUOTES: Please submit quotes by email to jmiranda@shimmick.com, david.wirth@shimmick.com and abraham.leon@shimmick.com.
Jamie Miranda
(707) 410-5070
(000) 000-0000
Address
1 Harbor Center, Suite 200
Suisun City, CA 94585
The U.S. Department of Transportation-supported Northwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »