For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
PROGRESSIVE DESIGN-BUILD SAN DIEGO-CORONADO BAY BRIDGE SUICIDE DETERRENT PROJECT
114306CM
Caltrans
Coronado, San Diego County, CA
05/07/2024 at 02:00
Myers-Traylor, Joint Venture are seeking DBE Subcontractors and Suppliers to bid on an upcoming project with Caltrans, Progressive Design-Build San Diego-Coronado Bay Bridge Suicide Deterrent Project, Contract No. 114306CM, Bidding on 5/7/2024 at 2:00 pm PST, with a 22% DBE goal. This project will design and construct a suicide deterrent, bridge bay enclosures, and CCTV monitoring cameras in accordance with the selected alternative and parameters included in the Final Environmental Document (FED) and Project Reports.
All items are available to bid on including, but not limited to items normally Myers-Traylor, Joint Venture would self-perform. See NAICS Codes & Descriptions of services for this scope are 541330 Engineering Services, 541620 Environmental Consulting Services, 561990-All Other Support Services, 541820-Public Relations Agencies, 561110-Office Administrative Services, 541310-Architectural Services, 541370-Surveying & Mapping Services, 561690-Other Scientific & Technical Consulting Services, 561414-Process, Physical Distribution & Logistics Consulting Services, 541611- Administrative Management & General Management Consulting Services, 926120-Regulation & Administration of Transportation Programs
Register for the Myers-Traylor DBE Virtual Outreach Meeting, April 17th, 2024 at 1:00 pm PST, to learn more about the project at the link below! https://events.teams.microsoft.com/event/4623cc62-812b-4543-814c-e939467ab557@0e69a141-4180-45b4-89bc-e4c41fce66bc
Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, and current insurance meeting Myers & Sons Construction's requirements. Subcontractors will be required to sign the standard Myers-Traylor, Joint Venture Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com.
Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers-Traylor, Joint Venture will work cooperatively with all qualified firms seeking work on this project. Myers-Traylor, Joint Venture is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers-Traylor, Joint Venture is an equal opportunity employer.
** All items are open for bid, including items of work normally performed by Myers-Traylor, Joint Venture. Quotations will be broken down into comparable packages as reasonably necessary Myers-Traylor, Joint Venture will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages. **
Clinton Myers
Mike Lewis
Telephone
(916) 283-9950
(916) 614-9520
Address
45 Morrison Avenue
Sacramento, CA 95838
The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »