DBEGoodFaith.com


is seeking qualified DBEs

Project Name

HMA, RHMA, Geosynthetic Pavement Interlayer


Bid/Contract #

01-0H1504


Awarding Agency

Caltrans


Project Location

Longvale, Mendocino County, CA


Bid Date

02/22/2024 at 14:00


Project Details

LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, TEMP BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, MOVE-IN/MOVE-OUT (TEMP EROSION CONTROL), TEMP HYDRAULIC MULCH, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP CONCRETE WASHOUT, ASBESTOS COMPLIANCE PLAN, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, DUST CONTROL PLAN, SHOULDER BACKING, CLASS 2 AGGREGATE BASE, HIGH FRICTION SURFACE TREATMENT, CRACK TREATMENT, SEGMENT CORRECTION, REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT, ASPHALT BINDER, GEOSYNTHETIC PAVEMENT INTERLAYER, DATA CORE, PLACE HOT MIX ASPHALT DIKE, TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, CORRUGATED STEEL PIPE DOWNDRAIN, ENTRANCE TAPER, DOWNDRAIN SLIP JOINT, REMOVE OVERSIDE DRAIN, ADJUST INLET, ADJUST OVERSIDE DRAIN, MINOR CONCRETE (CURB), REMOVE CURB, INLET GRATE, REMOVE PAVEMENT MARKER, DELINEATOR, PAVEMENT MARKERS, OBJECT MARKERS, REMOVE ROADSIDE SIGNS, FURNISH & INSTALL ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), VEGETATION CONTROL MAT, TRANSITION RAILING, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL, CONCRETE BARRIER TRANSITION, REMOVE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VIS), THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, TRAFFIC STRIPE TAPE WITH CONTRAST, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION


Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Get in Touch

Outreach Coordinator

Kirsten Foley


Project Estimator

Kody King

Telephone

(707) 443-6371


Fax

(707) 443-0277

Address

P.O. Box 1006
Eureka, CA 95502


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »