DBEGoodFaith.com


is seeking qualified DBEs

Project Name

Upgrade & Install New Transportation Management System Elements


Bid/Contract #

07-346204


Awarding Agency

Caltrans


Project Location

Los Angeles & Ventura Counties at Various Locations, Los Angeles & Ventura County, CA


Bid Date

02/15/2024 at 14:00


Project Details

LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, TEMP TRAFFIC STRIPE, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, TEMP BARRIER SYSTEM, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP CONCRETE WASHOUT, ASBESTOS COMPLIANCE PLAN, ASBESTOS SURVEY & SAMPLING, ROADWAY EXCAVATION, ROADSIDE CLEARING, PRUNE EXISTING PLANTS, MAINTAIN EXISTING PLANTED AREAS, WOOD MULCH, CHECK & TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, AGGREGATE BASE, LEAN CONCRETE BASE, HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, MINOR CONCRETE, FURNISH & INSTALL SIGN STRUCTURE, REMOVE CONCRETE, CHAIN LINK FENCE & GATE, GUARD RAILING DELINEATOR, OBJECT MARKER, RELOCATE ROADSIDE SIGN, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL MAT (RUBBER OR FIBER), END CAP, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL, REMOVE BRIDGE RAILING, THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE PAINTED TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, ELECTRICAL SERVICE, COMMUNICATIONS SYSTEMS, CAMERA SYSTEMS, MODIFYING FIBER OPTIC CABLE SYSTEMS, AUTOMATIC VEHICLE CLASSIFICATION SYSTEMS, MODIFYING CAMERA SYSTEMS, MODIFYING RAMP METERING SYSTEMS, MODIFYING TRAFFIC MONITORING STATIONS, MODIFYING CHANGEABLE MESSAGE SIGN SYSTEMS, BUILDING WORK


Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Get in Touch

Outreach Coordinator

Kirsten Foley


Project Estimator

Kody King

Telephone

(707) 443-6371


Fax

(707) 443-0277

Address

P.O. Box 1006
Eureka, CA 95502


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »