DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

For Construction on State Highway in Santa Clara County In and Near Morgan Hill and San Jose at Various Locations, District 04 on Route 101, 680


Bid/Contract #

04-2Q5704


Awarding Agency

State of California, Department of Transportation (Caltrans)


Project Location

Morgan HIll, San Jose, Santa Clara County County, CA


Bid Date

01/10/2024 at 02:00


Project Details

Shimmick Construction Company, Inc. is requesting quotes from DBE subcontractors and suppliers in the following scopes of work (including, but not limited to): Lead Compliance Plan; Level 2 Critical Path Method Schedule; Construction Area Signs; Traffic Control System; Stationary Impact Attenuator Vehicle; Channelizer (Surface Mounted); Temporary Barrier System; Portable Changeable Message Sign; Alternative Temporary Crash Cushion TL-3; Water Pollution Control Program; Street Sweeping; Temporary Dewatering and Non-Storm Water Discharge Control System; Temporary Concrete Washout; Asbestos Compliance Plan; Clearing & Grubbing; Imported Borrow; Remove Irrigation Facility; Rolled Erosion Control Product (Netting); Hydromulch; Fiber Rolls; Hydroseed; Compost; Prime Coat; Hot Mix Asphalt (Type A); Place Hot Mix Asphalt (Misc. Area); 36” Reinforced Concrete Pipe Trenchless Installation Method; Pumping Plant Equipment; Pumping Plant Electrical Equipment; Misc. Iron & Steel; Maintaining Existing Traffic Management System Elements During Construction


Plans and specifications for this project may be downloaded free of charge using the following link: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=04-2Q5704. You may also contact Jamie Miranda at jmiranda@shimmick.com for access.

Should you require assistance with your bid, please contact our lead estimator Aaron Lai at alai@shimmick.com.

All items of work listed above are made available, even items of work normally performed by Shimmick. Please contact the lead estimator listed above for assistance with breaking down items of work into economically feasible units, with assistance obtaining equipment, supplies, materials, bonding, insurance, estimating, or related assistance. 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. Shimmick Construction’s listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Shimmick Construction requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. For assistance with bonding, insurance or lines of credit contact Devin Nordhagen at devin.nordhagen@shimmick.com.

Get in Touch

Outreach Coordinator

Jamie Miranda


Telephone

(707) 410-5070


Fax

(000) 000-0000

Address

1 Harbor Center, Suite 200
Suisun City, CA 94585


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »