DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

San Pablo Avenue Pedestrian Improvement Phase 1


Bid/Contract #

C23-08


Awarding Agency

City of Albany


Project Location

Albany, Alameda County, CA


Bid Date

10/26/2023 at 14:00


Project Details

FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following scopes of work, including but not limited to: Construction Area Signs, Flashing Arrow Sign, Traffic Cone, Temporary Fiber Roll, Temporary Gravel Bag Berm, Street Sweeping, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Remove Concrete (Miscellaneous), Class 2 Aggregate Base, Replace Asphalt Concrete Surfacing, Remove Asphalt Concrete Pavement, Hot Mix Asphalt (Type A), Tack Coat, Cold Plane Asphalt Concrete Pavement, Remove Pedestrian Barricade, Miscellaneous Iron and Steel �" 3” Cast Iron Pipe (Storm Drain System), Remove Storm Drain, Adjust City Of Albany Sanitary Sewer Cleanout To Grade, Adjust City Of Albany Sanitary Sewer Manhole Cover To Grade, Adjust Caltrans Traffic Signal Cover To Grade, Adjust Caltrans Signal Detector Handhole Utility Cover To Grade, Adjust EBMUD Water Meter Frame And Cover To Grade (Spa And Castro), Minor Concrete (Sidewalk And Curb Ramp), Minor Concrete (Curb And Gutter), Detectable Warning Surface, Jointed Plain Concrete Pavement, Minor Concrete (Curb) (Island Curbs), Minor Concrete (Island Paving), Remove Concrete (Curb, Gutter And Sidewalk), Wood Mulch, Paint Curb (2-Coat), Remove Marker, Remove Roadside Sign (Metal Post), Furnish Single Sheet Aluminum Sign (0.063”-Unframed), Roadway Sign �" One Post, Install Sign (Strap And Saddle Bracket Method), 6” Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7), 6” Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8” Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Thermoplastic Crosswalk And Pavement Marking (Enhanced Wet Night Visibility), 12” Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Flashing Beacon System (RRFB) San Pablo & Portland, Flashing Beacon System (RRFB) San Pablo & Castro, Modifying Signal And Lighting Systems, San Pablo & Brighton, Modifying Signal And Lighting Systems, San Pablo & Clay, Mobilization, Adjust PG&E Gas Utility Cover To Grade, Adjust AT&T Communications Utility Cover To Grade, Adjust PG&E Gas Utility Anode Cover To Grade, Adjust PG&E Electric Vault Cover To Grade, Adjust EBMUD Water Valve Frame And Cover To Grade


A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

Get in Touch

Outreach Coordinator

Danielle Whitelaw


Project Estimator

Marcus Hanson (mhanson@vc-inc.net)

Telephone

(925) 245-1300


Fax

(925) 245-1244

Address

550 Greenville Road
Livermore, CA 94550


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »