DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Remove existing pavement and replace with concrete pavement


Bid/Contract #

10-1E3004


Awarding Agency

California Department of Transportation


Project Location

Various Locations, San Joaquin County, CA


Bid Date

11/30/2023 at 14:00


Project Details

FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following scopes of work, including but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Ls), Renewable Diesel Report, Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute, Resolution- Board-Related Tasks, Safety Quality Control Manager, Construction Area Signs, Traffic Control System, Traffic Control Supervisor, Stationary Impact Attenuator Vehicle, Temporary Traffic Stripe (Tape), Temporary Pavement Marking (Tape), Channelizer (Surface Mounted), Plastic Traffic Drums, Portable Radar Speed Feedback Sign System Day, Portable Lighting Systems, Temporary Pavement Marker, Temporary Barrier System, Temporary Pedestrian Access Route, Portable Changeable Message Sign (Ls), Temporary Automated End Of Queue Warning System (Type 1) Day End Of Queue Monitoring And Warning With Truck Mounted Changeable Message Sign Day, Temporary Crash Cushion Module, Alternative Temporary Crash Cushion Tl-3, Temporary Radar Speed Feedback Sign System, Job Site Management, Stormwater, Pollution Prevention Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Asbestos Compliance Plan, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Treated Wood Waste, Contractor-Supplied Biologist (Ls), Natural Resource Protection Plan, Bird Exclusion Devices, Remove Concrete (Cy), Clearing And Grubbing (Ls), Roadway Excavation, Shoulder Backing, Structure Excavation (Bridge), Structure Backfill (Bridge), Imported Borrow (Cy), Move-In/Move-Out (Erosion Control), Dry Seed (Sqft), Fiber Rolls, Compost (Cy), Class 2 Aggregate Subbase, Class 2 Aggregate Base (Cy), Base Bond Breaker, Segment Correction, Replace Asphalt Concrete Surfacing, Hot Mix Asphalt (Type A), Textured And Colored Hot Mix Asphalt Rubberized Hot Mix Asphalt (Gap Graded), Data Core, Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Continuously Reinforced Concrete Pavement, Jointed Plain Concrete Pavement (Rsc), Drill And Bond (Dowel Bar), Individual Slab Replacement (Rsc), 60" Cast-In-Drilled Hole Concrete Pile (Sign Foundation), Structural Concrete, Bridge, Structural Concrete, Approach Slab (Type R), Structural Concrete, Bridge (Rsc), Paving Notch Extension, Drill And Bond Dowel, Drill And Bond Dowel (Chemical Adhesive)(Lf), Clean Expansion Joint, Joint Seal (Mr 1/2"), Joint Seal (Mr 1"), Joint Seal (Mr 1 1/2"), Bar Reinforcing Steel (Bridge), Furnish Sign Structure (Truss), Install Sign Structure (Truss), Furnish Sign Structure (Bridge Mounted Without Walkway), Install Sign, Structure (Bridge Mounted Without Walkway), Furnish Sign Structure (Versatile Truss), Install Sign Structure (Versatile Truss), Aluminum Walkway Grating (Versatile Truss), Remove Bridge Mounted Sign, Pedestrian Barricade, Bridge Removal (Portion), Location A, Bridge Removal (Portion), Location B, Bridge Removal (Portion), Location C, Adjust Inlet, Remove Slope Paving (Sqyd), Slope Paving (Concrete), Minor Concrete (Dike), Detectable Warning Surface, Minor Concrete (Miscellaneous Construction), Pre/Post Construction Surveys, Remove And Replace Monument, Remove Pavement Marker, Delineator (Class 1), Guard Railing Delineator, Pavement Marker (Retroreflective), Remove Roadside Sign, Remove Sign From Sign Frame, Furnish Laminated Panel Sign (1"-Type A), Furnish Laminated Panel Sign (1"-Type B), Furnish Laminated Panel Sign (2 1/2"-Type B), Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.063"-Framed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Install Roadside Sign (Laminated Wood Box Post), Furnish, Laminated Wood Box Post (Type L), Furnish Laminated Wood Box Post (Type M), Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Double Midwest Guardrail System (Steel Post), Single Thrie Beam Barrier (Steel Post), Double Thrie Beam Barrier (Steel Post), Transition Railing (Type Stb), Transition Railing (Type Dtb), Transition Railing (Type Wb-31), Rail Tensioning Assembly, Modified Rail Tensioning Assembly, End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal Tl-3, Alternative Crash Cushion Tl-3, Concrete Barrier (Type 60Ms), Concrete Barrier Transition, Concrete Barrier (Type 842), Remove Guardrail, Salvage Metal Bridge Railing, Remove Concrete Barrier, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3), 12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Contrast Stripe, Remove Thermoplastic Pavement Marking, 12" Rumble Strip (Asphalt Concrete Pavement), 12" Rumble Strip (Concrete Pavement), Contrast Stripe Paint (1-Coat), 6" Traffic Stripe Tape (Warranty), 6" Traffic Stripe Tape (Warranty) (Broken 36-12), 6" Traffic Stripe Tape With Contrast (Warranty), 6" Traffic Stripe Tape With Contrast (Warranty) (Broken 36-12), Maintaining Existing Traffic Management System Elements During Construction, Traffic Monitoring Station System, Modifying Highway Advisory Radio Systems, Modifying Roadside Weather Information Systems, Conduit System, Changeable Message Sign System, Camera Systems, Modifying Lighting Systems, Modifying Signal And Lighting Systems, Modifying Traffic Monitoring Stations, Modifying Extinguishable Message Sign Systems and Mobilization


A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available for download at the Caltrans website at the following link: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=10-1E3004. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

Get in Touch

Outreach Coordinator

Danielle Whitelaw


Telephone

(925) 245-1300


Fax

(925) 245-1244

Address

550 Greenville Road
Livermore, CA 94550


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »