DBEGoodFaith.com


Company Logo

is seeking qualified DVBEs

Project Name

SRJC Tauzer Gymnasium Modernization


Bid/Contract #

--


Awarding Agency

Santa Rosa Junior College


Project Location

Santa Rosa, Sonoma County, CA


Bid Date

10/05/2023 at 02:00


Project Details

SCOPE: Modernization & remodel of Buildings N, E & W. Includes selective demo, seismic retrofit, replace windows & doors, replace MEP systems, new flooring, remove & replace bleachers, flooring & wall finishes, new hydraulic elevator, removal of (E) swimming pool; paving, finishes & landscaping in courtyard, ADA pathways, parking lot, generator with ext. enclosure, utility enclosure.

This is an electronic bid submittal â€" therefore we are closing the bid at 1:30 PM in order to enter all information on-line.
Please submit your bids by no later than 1:30 on bid day.

This project will have an Owner Controlled Insurance Program (OCIP).
Subcontractors shall exclude from their bids any and all costs for insurance coverage provided under the OCIP
(So exclude the cost for on-site Worker’s Comp, Employer’s Liability, General Liability, Excess Liability, and Pollution Liability).
All insurance for off-site locations, labor and operations are not covered by the OCIP.
Subcontractors are also required to provide Automobile Liability coverage for both on-site and off-site activities.

Prevailing Wage Required (NO PLA) / LEED Silver Project / 5% Retention / See Section 00 73 17 of the Project Manual Specifications & the Owner Controlled Insurance Program (OCIP) for Insurance Requirements to include/exclude in your bid /
RFI Deadline to Owner is Fri 9/1/23 by 5PM / MEP Subs MUST be Prequalified-Shortlisted to Bid / 550 Cal. Day Duration / $1,500 per Cal. Day - Liquidated Damages / See Addendum #1 for Add & Deduct Alternates to include in your bid

Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
It is now State of CA law to include CSLB license # & DIR # on bid sub list â€" make sure to put them on your bid scope’s 1st page!
Subcontractors & Suppliers are required to comply with Alten’s standard subcontract(s) which can be found on our website www.altenconstruction.com

TRADES NEEDED (but not limited to): HazMat Abatement; Selective Demo; Earthwork; Asphaltic Concrete Paving; Site Concrete; Pavement Markings; Synthetic Grass Surfacing; Synthetic Resilient Syst.; Resilient Surface Systems; Gate Equipment; Site Furnishings; Planting & Irrigation; Site Water/Sanitary Sewerage/Drainage Systems; Rebar; CIP Concrete; Concrete Repair & Sealing; Masonry Restoration & Cleaning; Structural & Misc Steel; CF Metal Framing; Metal Fabrications; Metal Stairs; Rough & Finish Carpentry; Architectural Woodwork; Roofing Repairs; Thermal Insulation; Perf. Metal Wall Panels; Elastomeric KEE Membrane Roofing; Flashing & Sheet Metal; Roof Hatches; Firestopping; Joint Sealants; Exp. Joint Covers; Doors, Frames & Hardware; Access Doors & Panels; Overhead Coiling Doors; Glazed Curtainwall, Entrances, & Storefronts; Alum. & Steel Windows; Skylights; Door Operators; Glazing; Mirrors; Int. Plaster Patching; Wood Floor & Ceiling Restoration; Gypsum Board Assemblies; PC Plaster; Tiling; Acoustical Ceiling; Tectum Ceiling Panels; Wood & Rubber Sheet Dance Flooring; Resilient Tile Flooring, Stair Accessories and Base; Resilient Athletic Flooring; Resinous Terrazzo Flooring; Resinous Sports Flooring; Tile Carpeting; Acoustical Felt Wall Covering; Fiberglass Wall Panels; Tectum Acoustic Treatment; Painting & Coatings; Signage; Toilet & Shower Compartments; Wire Mesh Partitions; Corner Guards; Protective Wall Covering; Toilet Accessories; Fire Ext. Cabinets; Metal Lockers & Storage Shelving; Bird Control; Residential Appliances; Stage Curtains; Athletic Equipment; Window Shades; Telescoping Bleachers; Hydraulic Elevator; Fire Sprinklers; Plumbing; HVAC; Electrical; Communications; and Electronic Safety & Security.


Plans & Specifications are available for review and take-off in our office & free download on Procore.
Bid Coordinator: Karin Romeo x26 / Chief Estimator: Erik Andresen x15
Estimator & Planroom Access: Bobby Alten x47
Phone: 1-510-234-4200 Email: bids@altenconstruction.com
Fax: (Dial 1 + Area Code even from a 510 number) 1-510-234-4221


In order for bids to be considered, they must be received at our office by email, mail, phone or fax one half hour prior to bid closing time.

PREVAILING WAGE RATES, INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED) & WKLY CERTIFIED PAYROLL RPTS SUBMITTED ON LCP TRACKER ARE REQUIRED. 100% PERFORMANCE & PAYMENT SUB BONDS MAY BE REQUIRED. ALTEN CONSTRUCTION WILL PAY UP TO 1.5% OF BOND PREMIUM
PLEASE RESPOND TO EMAILED PROCORE INVITATION STATING WHETHER OR NOT YOU ARE BIDDING.
TO REQUEST ACCESS TO PROCORE, EMAIL bids@altenconstruction.com OR CALL (510) 234-4200 x47.


ALTEN CONSTRUCTION, INC IS AN EQUAL OPPORTUNITY EMPLOYER
WE ARE SIGNATORY TO THE CARPENTER'S & LABORER'S UNIONS

Subcontractors & Suppliers are required to comply with Alten’s standard subcontract(s) which can be found on our website

NOTICE: BY SUBMITTING A BID, BIDDING SUBCONTRACTOR, SUPPLIER OR VENDOR AGREE, WARRANTS AND UNDERSTANDS THAT A) ALTEN IS RELYING ON THAT BID FOR ITS BID TO OWNER, AND THE BID MAY NOT BE WITHDRAWN AFTER BID OPENING; B) THAT BIDDER HAS REVIEWED THE PLANS AND SPECIFICATIONS, AND AS TO ITS SCOPE OF WORK, AGREES TO PERFORM ALL DUTIES INCLUDING INSURANCE AND INDEMNITY OBLIGATIONS, THAT ARE SPECIFIED BY OWNER AS ALTEN’S DUTIES, TO BIDDER’S DUTIES TO ALTEN; AND C) THAT UPON ALTEN’S AWARD OF THE PRIME CONTRACT SUBCONTRACTOR WILL DULY AND TIMELY EXECUTE ALTEN’S FORM SU BCONTRACT AS TO THE BID SCOPE OF WORK IN THE BID.

Get in Touch

Outreach Coordinator

Karin Romeo


Project Estimator

Simon Chiu

Telephone

(510) 234-4200 Ext. 26


Fax

(510) 234-4221

Address

1141 Marina Way South
Richmond, CA 94804


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »