DBEGoodFaith.com


Company Logo

is seeking qualified MBEs, WBEs, SBA MBEs

Project Name

Foothill Water Treatment Plant Generator


Bid/Contract #

Job No. 2638 Bid Schedule No. 5368


Awarding Agency

City of Redding


Project Location

Redding, Shasta County, CA


Bid Date

05/18/2023 at 03:00


Project Details

SnL Group, Inc. is seeking quotes from all qualified vendors, subcontractors, service and material providers, including all certified MBE/WBE firms for the following items of work per plans and specs, including but not limited to: WPCP, site Demolition & excavation, aggregate materials; base, concrete, asphalt, and gravel, masonry, rebar, paving, water services, electrical work including but not limited to; switchboards, distribution panelboards, standby generator, light poles, and all work to replace two existing transformers, new shade structure erection, painting and roofing.

SnL Group, Inc. is available to discuss breaking out any portion of work to encourage minority participation.


MBE/WBE's can no longer self-certify, must be certified at bid opening, and MBE/WBE firms must provide proof certification with their bid.

SnL Group, Inc.'s estimator can be reached at the office (530) 222-5048, and is available to provide you with any assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. SnL Group, Inc. may also assist in obtaining any necessary equipment, supplies, materials or related services.

Plans, specifications and project requirements may be reviewed at our office in Redding, CA. They can also be viewed and downloaded online at https://www.cityofredding.org/departments/public-works/engineering/project-bid-opportunities

Wage Requirements are Prevailing Wage for the State of California and Davis Bacon www.dir.ca.gov (https://www.dir.ca.gov/Public-Works/Prevailing- Wage.html). Each subcontractor must submit proof of current DIR Registration when submitting a quote.

Insurance Requirements: each subcontractor must submit proof of work comp insurance and obtain work comp throughout the completion of the project.

Requirements: by submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. SnL's written subcontract documents execution is required of all successful subcontract bids.

Get in Touch

Outreach Coordinator

Tommi Compton


Telephone

(530) 222-5048


Fax

(530) 222-5140

Address

9818 Holton Way
Redding, CA 96003


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »