DBEGoodFaith.com


is seeking qualified DBEs

Project Name

Alpine Road Undercrossing Route 280/380 Separation


Bid/Contract #

04-4J8504


Awarding Agency

State of California Department of Transportation


Project Location

Menlo Park, San Mateo County, CA


Bid Date

03/16/2023 at 02:00


Project Details

Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:
LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD (WDAY),DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION- BOARD-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (TAPE), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), ALTERNATIVE TEMPORARY CRASH CUSHION TL-3, TEMPORARY TRAFFIC SCREEN, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION ROADWAY, STREET SWEEPING, TEMPORARY ACTIVE TREATMENT SYSTEM, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, STREAM RESTORATION HYDRAULIC MONITORING, TEMPORARY CREEK DIVERSION SYSTEMS, TREATED WOOD WASTE, REMOVE CONCRETE (SQYD), TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), CHANNEL EXCAVATION, (F) - STRUCTURE EXCAVATION (BRIDGE), (F) - STRUCTURE EXCAVATION (TYPE D), (F) - STRUCTURE BACKFILL (BRIDGE), NATIVE BACKFILL, ROADSIDE CLEARING, SOIL AMENDMENT, SLOW-RELEASE FERTILIZER, PLANT (GROUP H), PLANT (GROUP B), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, 2" WYE STRAINER ASSEMBLY, TREE WELL SPRINKLER ASSEMBLY, CAM COUPLER ASSEMBLY, (F) - 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), PRESSURE REGULATING VALVE, BALL VALVE, MOVE-IN/MOVE-OUT (EROSION CONTROL), IMPORTED TOPSOIL (CY), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, FIBER ROLLS, COMPOST SOCK, HYDROSEED, COMPOST (CY), CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), (F) - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, (F) - STRUCTURAL CONCRETE, BRIDGE FOOTING, DRILL AND BOND DOWEL, (F) - BAR REINFORCING STEEL (BRIDGE), (F) - ASPHALT MEMBRANE WATERPROOFING, (F) - COLUMN CASING, TRASH NET (END OF PIPE CONNECTION), (F) - CLASS 2 PERMEABLE MATERIAL (BLANKET), REMOVE CONCRETE (CHANNEL), STRUCTURAL ROCK (ROCK GROUP A, PLACEMENT METHOD A), REMOVE SLOPE PAVING (SQYD), STRUCTURAL ROCK (ROCK GROUP B, PLACEMENT METHOD A), STRUCTURAL ROCK (ROCK GROUP C, PLACEMENT METHOD A), SLOPE PAVING (CONCRETE), REMOVE GABION (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ESM-1 (6" D50), PLACEMENT METHOD B, ESM-2, PONDING/ RODDING, CHAIN LINK FENCE (TYPE CL-4), 6' CHAIN LINK GATE (TYPE CL-4), REMOVE CHAIN LINK FENCE, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), TREATMENT BEST MANAGEMENT PRACTICE MARKER, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), DOUBLE MIDWEST GUARDRAIL SYSTEM, SINGLE THRIE BEAM BARRIER, TRANSITION RAILING (TYPE STB), TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE CRASH CUSHION TL-3, CONCRETE BARRIER (TYPE 60M), CONCRETE BARRIER (TYPE 60MF), CONCRETE BARRIER (TYPE 60MS), (F) - CONCRETE BARRIER TRANSITION, REMOVE GUARDRAIL, REMOVE CONCRETE BARRIER, REMOVE THERMOPLASTIC TRAFFIC STRIPE, 6" TRAFFIC STRIPE TAPE (WARRANTY) (BROKEN 17-7), MOBILIZATION


All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.
Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting Bridgeway’s requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.

Get in Touch

Outreach Coordinator

Barbara Sasser


Project Estimator

Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone

(707) 455-7033


Fax

(707) 455-7036

Address

3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »