DBEGoodFaith.com


Login
Sign Up
Company Logo

is seeking qualified DBEs

Project Name

San Mateo County Bridge


Bid/Contract #

04-2J7304


Awarding Agency

Caltrans


Project Location

Redwood City , San Mateo County, CA


Bid Date

01/26/2023 at 02:00


Project Details

This is a bridge project with the typical items of work associated. Myers & Sons Construction, LLC is currently the General Contractor and is requesting quotes from all qualified subcontractors, trucking firms and suppliers including certified DBE firms for any part of the following types of work, including but not limited to:

LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TRAFFIC CONTROL SUPERVISOR, STATIONARY IMPACT ATTENUATOR VEHICLE, AUTOMATED WORK ZONE INFORMATION SYSTEM, CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), TEMPORARY AUTOMATED END OF QUEUE WARNING SYSTEM (TYPE 2) DAY, END OF QUEUE MONITORING AND WARNING WITH TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY, MOBILE BARRIER SYSTEM, ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY DEWATERING AND NON-STORM WATER DISCHARGE CONTROL SYSTEM, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, TREATED WOOD WASTE, INVASIVE SPECIES CONTROL, NOISE MONITORING, REMOVE CONCRETE (CY), TEMPORARY HIGH-VISIBILITY FENCE, TEMPORARY CONSTRUCTION MAT (LS), CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), (F) - STRUCTURE EXCAVATION (TYPE D), (F) - STRUCTURE BACKFILL (BRIDGE), (F) - STRUCTURE BACKFILL (SLURRY CEMENT), DITCH EXCAVATION, ROADSIDE CLEARING, CULTIVATION, SOIL AMENDMENT, ORGANIC FERTILIZER, PLANT (GROUP M), PLANT (GROUP A), PLANT (GROUP B), PLANT ESTABLISHMENT WORK, WOOD MULCH, CONTROL AND NEUTRAL CONDUCTORS (ARMOR-CLAD), 1 1/2" REMOTE CONTROL VALVE, 2" REMOTE CONTROL VALVE, 2" WYE STRAINER ASSEMBLY, 12 STATION IRRIGATION CONTROLLER (WALL MOUNTED), RECYCLED WATER IDENTIFICATION AND WARNING SIGNS, (F) - 2" SUPPLY LINE (BRIDGE), (F) - 3" SUPPLY LINE (BRIDGE), FLOW SENSOR CABLE, FLOW SENSOR, TREE WELL SPRINKLER ASSEMBLY, RISER SPRINKLER ASSEMBLY, 3" GATE VALVE, (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), (F) - 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), BALL VALVE, (F) - PVC PIPE CONDUIT (SLEEVE), MOVE-IN/MOVE-OUT (EROSION CONTROL), ROLLED EROSION CONTROL PRODUCT (BLANKET), HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST (CY), TEMPORARY TRENCH COVER, FURNISH 24" STEEL PIPE PILING, DRIVE 24" STEEL PIPE PILE, STEEL SHEET PILING, 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), (F) - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N), (F) - STRUCTURAL CONCRETE, DRAINAGE INLET, (F) - STRUCTURAL CONCRETE, BRIDGE (RSC), FURNISH PRECAST PRESTRESSED CONCRETE SLAB (TYPE SIV MODIFIED), FURNISH PRECAST CONCRETE ABUTMENT SEGMENT, FURNISH PRECAST CONCRETE WINGWALL, ERECT PRECAST PRESTRESSED CONCRETE DECK UNIT, ERECT PRECAST CONCRETE ABUTMENT SEGMENT, ERECT PRECAST CONCRETE WINGWALL, JOINT SEAL (MR 1"), JOINT SEAL (TYPE AL), (F) - BAR REINFORCING STEEL (BRIDGE), (F) - BAR REINFORCING STEEL (BRIDGE, EPOXY COATED), (F) - BAR REINFORCING STEEL (BRIDGE, STAINLESS STEEL), (F) - FURNISH SIGN STRUCTURE (TRUSS), (F) - INSTALL SIGN STRUCTURE (TRUSS), BRIDGE REMOVAL, 24" ALTERNATIVE PIPE CULVERT, 21" X 15" ALTERNATIVE PIPE ARCH CULVERT, BIORETENTION, TRASH NET (END OF PIPE CONNECTION), TRASH NET (OPEN CHANNEL), DRAINAGE INLET MARKER, GRATED LINE DRAIN, REMOVE GRATED LINE DRAIN, REMOVE CULVERT (LF), REMOVE INLET, REMOVE FLARED END SECTION (EA), ADJUST INLET, CONCRETE (DITCH LINING), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), (F) - MISCELLANEOUS IRON AND STEEL, 2" RECYCLED WATER SERVICE LINE CONNECTION, RECYCLED WATER MAIN RELOCATION, CHAIN LINK FENCE (TYPE CL-4, VINYL-CLAD), CHAIN LINK FENCE (TYPE CL-6), REMOVE FENCE, REMOVE CHAIN LINK FENCE, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), TREATMENT BEST MANAGEMENT PRACTICE MARKER, REMOVE ROADSIDE SIGN, FURNISH FORMED PANEL SIGN (OVERHEAD), MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), (F) - CHAIN LINK RAILING (TYPE 7 MODIFIED), TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 60M), CONCRETE BARRIER (TYPE 60MC), CONCRETE BARRIER (TYPE 60MA MODIFIED), (F) - CONCRETE BARRIER (TYPE 842 MODIFIED), REMOVE CONCRETE BARRIER, REMOVE CONCRETE BARRIER (TYPE K), REMOVE CRASH CUSHION, 8" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 12-3), 6" TRAFFIC STRIPE TAPE (WARRANTY), 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY), 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 18-12), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, ELECTRIC SERVICE FOR IRRIGATION, FIBER OPTIC CABLE SYSTEMS, MODIFYING SIGN ILLUMINATION SYSTEMS, 2" CONDUIT (BRIDGE), 4" CONDUIT (BRIDGE), WATER METER CHARGES, MOBILIZATION


** All items are open for bid, including items of work normally performed by Myers & Sons Construction. Quotations will be broken down into comparable packages as reasonably necessary. Myers & Sons Construction will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages.

Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, and current insurance meeting Myers & Sons Construction's requirements. Subcontractors will be required to sign the standard Myers & Sons Construction, LLC Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Plans and Specs can also be downloaded through http://ppmoe.dot.ca.gov/des/oe/weekly-ads/plans.php?id=04-2J7304 and http://ppmoe.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=04-2J7304. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers & Sons Construction, LLC will work cooperatively with all qualified firms seeking work on this project. Myers & Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers & Sons Construction, LLC is an equal opportunity employer.

Get in Touch

Outreach Coordinator

Pada Vang


Project Estimator

Brooke Torres

Telephone

(916) 283-9950


Fax

(916) 614-9520

Address

45 Morrison Avenue
Sacramento, CA 95838


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »