DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

RT 54 San Diego Rehab


Bid/Contract #

11-424804


Awarding Agency

Caltrans


Project Location

San Diego, San Deigo County, CA


Bid Date

01/25/2023 at 02:00


Project Details

This is a roadway project with the typical items of work associated. Myers & Sons Construction, LLC is currently the General Contractor and is requesting quotes from all qualified subcontractors, trucking firms and suppliers including certified DBE firms for any part of the following types of work, including but not limited to:

LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, PLASTIC TRAFFIC DRUMS, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), ALTERNATIVE TEMPORARY CRASH CUSHION-TL-3, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, ASBESTOS COMPLIANCE PLAN, MANAGE SOLID WASTE GENERATED BY THE PUBLIC, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, REMOVE CONCRETE (CY), ROADWAY EXCAVATION, SHOULDER BACKING, IMPORTED BORROW (CY), ROADSIDE CLEARING, ROCK BLANKET, WEED GERMINATION, PACKET FERTILIZER, SLOW-RELEASE FERTILIZER, (F) - PLANT (GROUP H) (CARPOBROTUS EDULIS), PLANT (GROUP A), PLANT (GROUP U), MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK, WOOD MULCH, CHECK AND TEST EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, SALVAGE IRRIGATION FACILITY, CONTROL AND NEUTRAL CONDUCTORS, 1" REMOTE CONTROL VALVE, 1 1/2" REMOTE CONTROL VALVE, 32 STATION IRRIGATION CONTROLLER AND ENCLOSURE '120A', 16 STATION IRRIGATION CONTROLLER AND ENCLOSURE '120B', ANTENNA MAST, CERTIFY EXISTING BACKFLOW PREVENTERS, FLOW SENSOR, TREE WELL SPRINKLER ASSEMBLY, RISER SPRINKLER ASSEMBLY (GEAR DRIVEN), POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN), REPLACE VALVE BOX COVER, 2" GATE VALVE, (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2 1/2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), HYDROSEED, COMPOST (CY), INCORPORATE MATERIALS, CEMENT TREATED PERMEABLE BASE RAPID SETTING, BASE BOND BREAKER, ASPHALTIC EMULSION (FOG SEAL COAT), MICRO-SURFACING, REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE D), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, DRILL AND BOND (DOWEL BAR), SPALL REPAIR (POLYESTER CONCRETE), INDIVIDUAL SLAB REPLACEMENT (RSC), REPLACE JOINT SEAL (ASPHALT RUBBER), REPLACE JOINT SEAL (SILICONE), (F) - STRUCTURAL CONCRETE, DRAINAGE INLET, (F) - MINOR CONCRETE (MINOR STRUCTURE), REMOVE PEDESTRIAN BARRICADE, REMOVE SIGN STRUCTURE WALKWAY (EA), PUBLIC SAFETY PLAN, RAPID SETTING CONCRETE (PATCH), REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, (F) - TREAT BRIDGE DECK, FURNISH BRIDGE DECK TREATMENT MATERIAL, 24" ALTERNATIVE PIPE CULVERT, 24" PLASTIC PIPE, 36" PLASTIC PIPE, 24" REINFORCED CONCRETE PIPE, CONCRETE (CONCRETE APRON), DETECTABLE WARNING SURFACE, MINOR CONCRETE (CURB, SIDEWALK AND CURB RAMP), PRE/POST CONSTRUCTION SURVEYS, (F) - MISCELLANEOUS IRON AND STEEL, DELINEATOR (CLASS 1), GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD), RESET ROADSIDE SIGN (ONE POST), FURNISH LAMINATED PANEL SIGN (1"-TYPE A), FURNISH LAMINATED PANEL SIGN (1"-TYPE B), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED), ROADSIDE SIGN - ONE POST, SIGN POST SUPPORT SYSTEM, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL SIGN (MAST-ARM MOUNTED), INSTALL SIGN PANEL ON EXISTING FRAME, INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, MIDWEST GUARDRAIL SYSTEM (WOOD POST), MIDWEST GUARDRAIL SYSTEM (8' WOOD POST), DOUBLE MIDWEST GUARDRAIL SYSTEM (WOOD POST), TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE CRASH CUSHION SYSTEM, REMOVE GUARDRAIL, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 12" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC PAVEMENT MARKING, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), 8" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 12-3), CONTRAST STRIPE PAINT (2-COAT), REMOVE TRAFFIC STRIPE, 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 17-7), 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 36-12), 8" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY), ELECTRIC SERVICE FOR IRRIGATION, MODIFYING LIGHTING SYSTEMS, MODIFYING SIGNAL AND LIGHTING SYSTEMS, SUBSURFACE LOCATOR, MOBILIZATION


** All items are open for bid, including items of work normally performed by Myers & Sons Construction. Quotations will be broken down into comparable packages as reasonably necessary. Myers & Sons Construction will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, and current insurance meeting Myers & Sons Construction's requirements. Subcontractors will be required to sign the standard Myers & Sons Construction, LLC Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Plans and Specs can also be downloaded through http://ppmoe.dot.ca.gov/des/oe/weekly-ads/plans.php?id=11-424804 and http://ppmoe.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=11-424804. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers & Sons Construction, LLC will work cooperatively with all qualified firms seeking work on this project. Myers & Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers & Sons Construction, LLC is an equal opportunity employer.

Get in Touch

Outreach Coordinator

Pada Vang


Project Estimator

Joe Goehring

Telephone

(916) 283-9950


Fax

(916) 614-9520

Address

45 Morrison Avenue
Sacramento, CA 95838


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »