DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Upgrade of Main Sewage Pump and Power Distribution Systems at Rockaway WRRF R156-R02-DB


Bid/Contract #

20061179


Awarding Agency

The New York City Department of Environmental Protections


Project Location

106-21 Beach Channel Drive , Queens County, NY


Bid Date

12/10/2026 at 02:00


Project Details

Jett Industries, Inc. (Jett - Contractor) is assembling a bid for the "The Rockaway Wastewater Resource Recovery Facility (WRRF) is owned and operated by DEP. This
Project's objective is to improve the continued operational reliability of the Rockaway WRRF in
compliance with updated code requirements and operational optimization by upgrading and replacing its
main sewage pump (MSP) and power distribution systems, both of which have reached the end of their
useful life. The Project shall also provide odor control to specific areas to reduce potential complaints.
The major elements of work are as follows:
• Replacement and upgrade of the MSP System:
➢ Five West Drywell MSPs in service.
➢ The 48-inch force main header for the existing MSPs, that discharges into the WRRF's four
primary sedimentation tanks (PST).
➢ Six submersible pumps in service.
➢ The 42-inch force main header for the submersible pumps that discharges into the PSTs.
➢ Permanent demolition of two out-of-service East Drywell MSPs.
➢ Upgrades to the drywell MSP and ancillary support systems, including leveling metering.
➢ Flow metering equipment, remote monitoring and control for the new MSP system.
➢ Power sub-metering of the MSPs.
➢ Related ancillary systems, including motor control centers (MCC), lighting panels and
systems, and heating, ventilation, and air-conditioning (HVAC).
• Replacement and upgrade of the Power Distribution System:
➢ Standby Generator System.
➢ Main Incoming Feeders.
➢ Main Power Distribution Systems, including replacement of the 5 kilovolt (kV) and 13.2 kV
substation and switchgear (SWGR) systems.
➢ 12 MCCs.
➢ HVAC and Lightning Systems.
➢ Temporary Interim Systems.
➢ Related ancillary systems.
➢ Interconnection and excess distribution costs coordination with the Long Island Power Energy
and Gas (LIPSEG), the local power distribution utility, to accommodate the Project.
The Project also includes necessary work to meet the NYC and DEP's resiliency guidelines and
requirements, as well as applicable NYC Local Laws for Sustainability per GPR Section 01 36 63 -
Sustainability Requirements. The Design-Builder (DB) is responsible for identifying any applicable
updates and including them in the scope of work. All components of the Project shall have a useful life
expectancy as outlined in Useful Life of Capital Projects section of the NYC Mayor's Office of Climate &
Environmental Justice Climate Resiliency Design Guidelines.
The Work will occur in an active WRRF requiring continuous uninterrupted operation per GPR
Section 01 72 12 - Maintenance of Operation and Construction Staging and requirements in this Volume."


Drawings & Specifications
Contract documents, including plans & specifications can be viewed and downloaded at:
Link to Fileshttps://app.buildingconnected.com/projects/691b69ddd4c257139cee3a9a/files

The Bidder will be required to quote in compliance with all project plans and specifications. Non-Disclosure Agreements are provided when applicable. Addenda is posted and notification is sent to all invited bidders.

Insurance Requirements
Upon award, Subcontractors must provide insurance in accordance with our subcontract agreement. A copy of the subcontractor agreement can be found in Building Connected Project Plan Room.

Bonding Requirements
For subcontracts the Bidder shall furnish Performance and Payment Bonds equal to the full subcontract price. For Material Contracts, the bidder shall furnish Supply Bonds in amount equal to full Material Contract price. Bond premiums are reimbursable by Kiewit/Mass. Electric Construction Co. Jett Industries Inc.
Please provide current bond rate with Quote/Proposal or advise if you are unable to bond so that we my address this issue.

Submission of Proposals & Quotes
Proposals & Quotes from Contractors & Suppliers must be submitted on or prior to bid due date listed above. You can submit your quote.

1) Upload your proposal to Building Connected
E-mail your quote/ proposal to Lead Project Estimator Listed or procurementwcl@kiewit.com

How to get in touch

Outreach Coordinator
Patricia Salmon
323-574-2432

Project Estimator:
Griffin Cranmer

Griffin.Cranmer@kiewit.com

Get in Touch

Outreach Coordinator

Tricia Salmon


Project Estimator

Griffin Cranmer 480-773-0293

Telephone

(323) 574-2432


Fax

(000) 000-0000

Address

470 Chestnut Ridge Road
Woodcliff Lake, NJ 7677


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Northeast Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »