For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
Corydon Well Replacement Project - Professional Design, Bidding Support, Engineering Services During Construction
C2305
Elsinore Valley Municipal Water District
Lake Elsinore, Riverside County, CA
09/01/2026 at 10:00
AKM is seeking quotes for electrical engineering, surveying, geotechnical investigation, structural engineering, and potholing services.
AKM is SBE certified, but we are looking for DBE companies to fulfill the DBE requirements. The scope of work includes the preparation of the design, technical specifications, contract documents, and support during bidding and construction will consist of two phases.
Phase 1 - A set of technical specifications, civil site design drawings, and line-bid items for drilling and construction of the new well, and the abandonment of the existing Corydon Well . Includes bidding assistance and full time on-site construction management (CM) oversight.
Phase 2 - Preparation of technical specifications, architectural, civil, mechanical, structural, electrical, instrumentation and controls (I&C) design drawings for the Corydon Well site, and line-item bid schedule for the equipping, testing and commissioning of the new groundwater production well. Also support during bidding and engineering services during construction of this phase. EVMWD will procure a separate firm for the Phase 2 CM services.
This project has multiple State and Federal grants.
Subcontractors are required to be DIR certified and compliant.
RFP can be obtained from Planetbids
Agency: Elsinore Valley Municipal Water District
Invitation #: C2305
https://vendors.planetbids.com/portal/32069/bo/bo-detail/144001
Katie Neubauer
(949) 753-7333
(949) 753-7320
Address
553 Wald
Irvine, CA 92618
The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »