DBEGoodFaith.com


Company Logo

is seeking qualified DVBEs

Project Name

Walnut Grove Elementary School Transitional Kindergarten Expansion Project


Bid/Contract #

--


Awarding Agency

Pleasanton Unified School District


Project Location

Pleasanton, Alameda County, CA


Bid Date

02/03/2026 at 02:00


Project Details

Scope: New classroom building; remodel of existing classrooms; new playground, new parking lot, and associated work.

Please see cost breakouts & Alternates on the Bid Form & Proposal (Project Manual Section 004113) and breakout accordingly on your bid scope.
No Project Labor Agreement Prevailing Wage & Weekly Certified Payroll Reports on LCP Tracker
Refer to Insurance Requirements Section 13 in 00 72 13 General Conditions of the Project Manual & Include costs for insurance in your bid Site Walk Thurs 1/8/26 @ 3:30 PM at site
(non-mand. for subs)
5% Retention RFI Deadline is
1/27/26 by 2PM or earlier to owner MEP+FS Subs MUST be Prequalified with District to bid on this project Duration Dates
3/2026 - 1/29/27

1-Year General Warranty (refer to your spec section for
other potential warranties) $2,500 per Calendar Day - Liquidated Damages for each Activity and $3,500 per CD LDs for completion of project - See Section 01 32 13 of Project Manual for milestones/activities

New as of 1/1/24: SUBMIT CURRENT CARB CERTIFICATIONS WITH YOUR BID! New California Air Resource Board or C.A.R.B. requirements apply to all subcontractors with equipment on-site. Current certificates of compliance from the Air Resource Board's D.O.O.R.S. website and compliant equipment on-site will be required / monitored at all times by Alten staff.

Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html

It is now State of CA law to include CSLB license # & DIR # on bid sub list - make sure to put them on your bid scope's 1st page!

Alten Construction may implement a CCIP (Contractor Controlled Insurance Program) on this or any Project, but you are required to include the cost for all required insurance in your bid.

Subcontractors & Suppliers are required to comply with Alten's standard subcontract(s) which can be found on our website www.altenconstruction.com or requesting from our bid coordinator Karin Romeo at kromeo@altenconstruction.com.

TRADES NEEDED (but not limited to): Surveying; HazMat Abatement; Demolition; Earthwork; Utilities: Water, Sanitary Sewer, Storm Drainage, Subdrainage; & Surfacing; Parking Bumpers; Pavement Markings; Synthetic Turf & Turf Base; Chain Link Fences & Gates; Decorative Metal Fence; Planting & Irrigation; Site Concrete; Concrete Reinforcing; Underslab Vapor Barrier; Cast-in-Place Concrete; Concrete Sealers at Exp. Concrete Floors; Cast Underlayment; Metal Fabrications, Ladders, Railings; Sheathing; Rough Carpentry; Arch. Wood Casework; FRP; Thermal Insulation; Roof & Deck Insulation; Weather Resistive Barriers; Ventilated Rainscreen; Metal Roof Panels; TPA Membrane Roofing; Sheet Metal Flashing & Trim; Manuf. Copings; Roof Accessories; Firestopping; Joint Sealants; Exp. Joint Covers; Doors, Frames & Hardware; Access Doors & Panels; Storefronts; Glazing; Gypsum Board; Non-Struct. Metal Framing; Lath & Plaster; Tiling; Acoustical Ceiling; Resilient Flooring; Fluid-Applied Flooring; Sheet Carpeting; Fabric Covered Tack Paneling; Painting & Coating; Visual Display Units; Signage; Dimensional Letter Signage; Wall & Door Protection; Toilet/Bath/Laundry Accessories; Fire Protection Specialties; Wall Mounted Standards and Shelving; Roller Window Shades; Site Furnishings and Accessories; Fire Sprinklers; Plumbing; HVAC; Electrical; Communications; and Electronic Safety & Security.


Plans & Specifications are available for review and take-off in our office & free download on BuildingConnected.

Estimator & BuildingConnected Plan Room Access: Bobby Alten x47 / Bid Coordinator: Karin Romeo x26 / Chief Estimator: Erik Andresen x15 / Estimator: Cameron Araghi x33
Phone: 1-510-234-4200 Email: bids@altenconstruction.com
Fax: (Dial 1 + Area Code even from a 510 number) 1-510-234-4221

In order for bids to be considered, they must be received at our office by email, mail, phone or fax one half hour prior to bid closing time.

INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED)
100% PERFORMANCE & PAYMENT SUB BONDS MAY BE REQUIRED.
ALTEN CONSTRUCTION WILL PAY UP TO 1.5% OF BOND PREMIUM.

PLEASE RESPOND TO EMAILED BUILDING CONNECTED INVITATION STATING WHETHER OR NOT YOU ARE BIDDING.
TO REQUEST ACCESS TO BUILDING CONNECTED (A FREE SERVICE), EMAIL bids@altenconstruction.com OR CALL (510) 234-4200 x47.

ALTEN CONSTRUCTION, LLC IS AN EQUAL OPPORTUNITY EMPLOYER
WE ARE SIGNATORY TO THE CARPENTER'S & LABORER'S UNIONS

NOTICE: BY SUBMITTING A BID, BIDDING SUBCONTRACTOR, SUPPLIER OR VENDOR AGREE, WARRANTS AND UNDERSTANDS THAT:
A) ALTEN IS RELYING ON THAT BID FOR ITS BID TO OWNER, AND THE BID MAY NOT BE WITHDRAWN AFTER BID OPENING;
B) THAT BIDDER HAS REVIEWED THE PLANS AND SPECIFICATIONS, AND AS TO ITS SCOPE OF WORK, AGREES TO PERFORM ALL DUTIES INCLUDING INSURANCE AND INDEMNITY OBLIGATIONS, THAT ARE SPECIFIED BY OWNER AS ALTEN'S DUTIES, TO BIDDER'S DUTIES TO ALTEN; AND
C) THAT UPON ALTEN'S AWARD OF THE PRIME CONTRACT SUBCONTRACTOR WILL DULY AND TIMELY EXECUTE ALTEN'S FORM SUBCONTRACT AS TO THE BID SCOPE OF WORK IN THE BID.

Get in Touch

Outreach Coordinator

Karin Romeo


Project Estimator

Erik Andresen, Chief Estimator

Telephone

(510) 234-4200 Ext. 26


Fax

(510) 234-4221

Address

1141 Marina Way South
Richmond, CA 94804


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »