DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Aeration Basin and Dual Media Filter Influent Piping Rehabilitation Project


Bid/Contract #

9600


Awarding Agency

Silicon Valley Clean Water


Project Location

Redwood City, San Mateo County, CA


Bid Date

11/13/2025 at 02:00


Project Details

Subcontractors: Concrete Structure; Minor Concrete Structure; Core Concrete - Repair Bridge Deck; Reinforcing Steel; Waterproofing; Lumber & Timber; Welded Steel Pipe; Welding; Drainage Pumping Equipment; Pumping Plant Electrical Equipment; Saw Cutting; Temporary Fencing; Safety Studies; Construction Engineering & Inspection Services; Construction Management; Project and Document Control; Scheduling; Trucking (Super 10 Dump Truck, Flat Bed, Water Truck, End Dump, Street Sweeping, Hazardous Waste); Painting Structures; Heating & Air Conditioning; Sewer Connection; Coring; Cutting; Sandblasting; Construction Equipment Rental; Heavy Equipment Rental; Demolition

Suppliers: Safety Equipment; Lumber; Pipe; Drainage Systems; Tools


Plans are available to download for a charge on BarkerBlue at https://www.barkerblueplanroom.com/projects/374/details/aeration-basin-and-dual-media-filter-influent-piping-rehabilitation-project-cip9600. You may also contact Jamie Miranda at jmiranda@shimmick.com for a download link to view plans and specifications or to schedule an appointment via Teams to discuss the documents. Meetings are held during regular business hours.

Should you require assistance with your bid, please contact our lead estimator Derek Sappington at dsappington@shimmick.com.

All items of work listed above are made available, even items of work normally performed by Shimmick. Please contact the lead estimator listed above for assistance with breaking down items of work into economically feasible units, with assistance obtaining equipment, supplies, materials, bonding, insurance, estimating, or related assistance. 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. Shimmick Construction's listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor's conditions or exceptions included with the Subcontractor's price quote. Shimmick Construction requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. For assistance with bonding, insurance or lines of credit contact Todd Yoder at todd.yoder@shimmick.com.

Funding for this project is expected to be provided in full or in part by the Clean Water State Revolving Fund (SRF) through an agreement with the State Water Resources Control Board (SWRCB) and Silicon Valley Clean Water and/or the Water Infrastructure Finance and Innovation Act (WIFIA) through an agreement with the US EPA and Silicon Valley Clean Water. Recipients are required to use iron and steel products that are produced in the United States. Davis Bacon Prevailing Wage Requirements apply to this contract.

Get in Touch

Outreach Coordinator

Jamie Miranda


Telephone

(707) 410-5070


Fax

(000) 000-0000

Address

1 Harbor Center, Suite 200
Suisun City, CA 94585


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »