For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
Seventh Street Bridge Replacement Over Tuolumne River
Federal Aid Project No.: BRLS-5938(167)
Stanislaus County Public Works
Modesto, Stanislaus County, CA
10/29/2025 at 10:00
Subcontractors: Construction Area Signs; Thermoplastic Traffic Striping & Marking; Plane Asphalt Concrete; Remove Concrete; Remove Bridge Item; Clearing & Grubbing; Earthwork; Erosion Control; Finishing Roadway; Concrete Pumping; Paving Asphalt; Place Asphalt Concrete Dike; Cast-In-Drilled-Hole Concrete Piling; Prestressing Concrete; Concrete Structure; Reinforcing Steel; Signs; Reinforced Concrete Pipe; Reinforced Concrete Sewer Pipe; Corrugated Metal Pipe; Permeable Drain; Welded Steel Pipe; Sewer Manhole; Rock Slope Protection; Concrete Curb & Sidewalk; Fencing; Temporary Fencing; Land Surveyor; Environmental Biological Studies; Lead Compliance; SWPPP; Retainer Walls; Landscaping; Trucking; Demolition
Suppliers: Sand & Gravel; Concrete & Cement; Drainage Systems; Storm Water Systems
All items of work listed above are made available, even items of work normally performed by Shimmick. Please contact the lead estimator for assistance with breaking down items of work into economically feasible units, assistance obtaining equipment, supplies, materials, bonding, insurance, estimating, or any additional assistance. Shimmick Construction's listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor's conditions or exceptions included with the Subcontractor's price quote.
PLANS AND SPECIFICATIONS: Plans are available to download on PlanetBids at https://vendors.planetbids.com/portal/14599/bo/bo-detail/133804. You may also contact Jamie Miranda at jmiranda@shimmick.com for a download link to view plans and specifications or to schedule an appointment via Teams to discuss the documents. Meetings are held during regular business hours.
SHIMMICK CONTACTS:
Tony Mendez, Lead Estimator, tony.mendez@shimmick.com
Jamie Miranda, Estimating Coordinator, jmiranda@shimmick.com
ADDITIONAL INFORMATION: 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. For assistance with bonding, insurance or lines of credit contact Todd Yoder at todd.yoder@shimmick.com.
QUOTES: Please submit quotes to jmiranda@shimmick.com and tony.mendez@shimmick.com.
Jamie Miranda
Tony Mendez
Telephone
(707) 410-5070
(000) 000-0000
Address
1 Harbor Center, Suite 200
Suisun City, CA 94585
The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »