For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
Caltrans 02-1J2904 Hwy 299 Pit One Rock Ex
02-1J2904
Caltrans
Fall River Mills, Shasta County, CA
09/30/2025 at 02:00
Hat Creek Construction & Materials, Inc. (HCCMI) is seeking quotes from all qualified subcontractors/ suppliers including but not limited to DBE for the following items of work: LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, PORTABLE CHANGEABLE MESSAGE SIGN, END OF QUEUE MONITORING AND WARNING WITH TRUCK MOUNTED CHANGEABLE MESSAGE SIGN, TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION TL-3, AUTOMATED FLAGGER ASSISTANCE DEVICE, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, TREATED WOOD WASTA, CONTRACTOR SUPPLIED BIOLOGIST, ROADWAY EXCAVATION, ROADWAY EXCAVATION (BOULDER REMOVAL), ROCK EXCAVATION, HOT MIS ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIS ASPHALT (MISCELLANEOUS AREA), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, (F) - STRUCTURAL CONCRETE, DRAINAGE INLET, (F) - MINOR CONCRETE (MINOR STRUCTURE), 24" CORRUGATED STEEL PIPE (.138" THICK), REMOVE CULVERT (LF), REMOVE INLET, REMOVE HEADWALL, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), (F) - MISCELLANEOUS IRON AND STEEL, DOUBLE TWISTED WIRE MESH DRAPERY SYSTEM, CABLE NET ATTENUATOR (SQFT), CABLE NET DRAPERY (SQFT), REMOVE EXISTING ROCKFALL FENCE, MARKER (CULVERT), REMOVE MARKER, REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.080" - UNFRAMED), ROADSIDE SIGN-ONE POST, MIDWEST GUARDRAIL SYSTEM (8' STEEL POST), BURIED POST END ANCHOR (TYPE B-F), REMOVE GUARDRAIL, THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED), MOBILIZATION.
HCCMI is an equal opportunity employer and is willing to work with all qualified firms interested on this project. Subcontractors must possess a current contractor's license, current PWCR, insurance coverage and worker's compensation for the entire length of the contract. Firms are also required to comply with all In Use Off Road Diesel Vehicle regulations. If qualified firms need assistance in obtaining project plans, specifications, or requirements please contact estimating@hatcreekconstruction.com or our office at (530) 355-5501 or can also be viewed at 24339 State Highway 89 North, Burney, CA 96013. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bond may be required. Please call if you need assistance obtaining insurance, bonding, equipment, materials, and/or supplies. HCCMI intends to work cooperatively with all qualified firms seeking work on this project. We will work with any interested subcontractor/supplier to identify opportunities to break items into economically feasible packages.
Jocelyn Murchison
James Folsom
Telephone
(530) 335-5501
(530) 335-5510
Address
24339 State Highway 89 North
Burney, CA 96013
The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »