For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
CONSTRUCTION ON STATE HIGHWAY IN HUMBOLDT COUNTY NEAR ALTON FROM 0.3 MILE SOUTH OF VAN DUZEN RIVER BRIDGE 4-17 TO DEL NORTE COUNTY LINE
01-0H6504
CALTRANS
ALTON, Humboldt County, CA
06/18/2025 at 02:00
STIMPEL WIEBELHAUS ASSOCIATES, INC. IS SEEKING QUALIFIED SUBCONTRACTRACTORS FOR THE FOLLOWING WORK, LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, TIME-RELATED OVERHEAD, DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE DAY, CHANNELIZER, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, TEMPORARY BARRIER SYSTEM, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN, ALTERNATIVE TEMPORARY CRASH CUSHION, AUTOMATED FLAGGER ASSISTANCE DEVICE, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, TEMPORARY EROSION CONTROL BLANKET, TEMPORARY MULCH, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY REINFORCED TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION ROADWAY, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS, WATER QUALITY MONITORING, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, CONTRACTOR-SUPPLIED BIOLOGIST, NATURAL RESOURCE PROTECTION PLAN, AQUATIC SPECIES PROTECTION AND RELOCATION INVASIVE SPECIES CONTROL, REMOVE CONCRETE, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, IMPORTED BORROW, PLANT ESTABLISHMENT, WOOD MULCH, HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT, FIBER ROLLS, COMPOST, INCORPORATE MATERIALS, AGGREGATE BASE, HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, PLACE HOT MIX ASPHALT, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, DRAINAGE INLET, STRUCTURAL CONCRETE, CONCRETE BACKFILL, CONCRETE COLLAR, PLASTIC PIPE, REINFORCED CONCRETE PIPE, CORRUGATED STEEL PIPE, SLOTTED CORRUGATED STEEL PIPE, CORRUGATED STEEL PIPE DOWNDRAIN, ENTRANCE TAPER, ANCHOR ASSEMBLY, DRAINAGE INLET MARKER, CORRUGATED STEEL PIPE INLET, CORRUGATED STEEL PIPE ENERGY DISSIPATOR, WELDED STEEL PIPE, STEEL FLARED END SECTION, CONCRETE FLARED END SECTION, TRENCHLESS WELDED STEEL PIPE, PRECAST CONCRETE PIPE INLET, INLET DEPRESSION, ABANDON CULVERT, REMOVE OVERSIDE DRAIN, REMOVE CULVERT, REMOVE SLOTTED CORRUGATED STEEL PIPE, REMOVE DOWNDRAIN, REMOVE INLET, REMOVE HEADWALL, REMOVE PCC APRON, REMOVE CONCRETE FLARED END SECTION, REMOVE FLARED END SECTION, CULVERT SLURRY-CEMENT BACKFILL, CONCRETE, GRAVEL FILTER, ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION, MISCELLANEOUS IRON AND STEEL, TEMPORARY FENCE, MARKER, REMOVE MARKER, RESET ROADSIDE SIGN, CABLE RAILING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING SIGNAL AND LIGHTING SYSTEMS, MODIFYING CHANGEABLE MESSAGE SIGN SYSTEMS, MOBILIZATION.
STIMPEL-WIEBELHAUS ASSOCIATES, INC. (SWA) WILL WORK WITH INTERESTED SUBCONTRACTORS TO IDENTIFY OPPORTUNITIES TO BREAK DOWN ITEMS INTO ECONOMICALLY FEASIBLE PACKAGES TO ENCOURAGE MINORITY CONTRACTOR PARTICIPATION.
SWA IS A UNION SIGNATORY CONTRACTOR AND SUBS SHALL BE REQUIRED TO BE OR TO SIGN AN APPROVED ONE TIME TERMS/CONDITIONS AGREEMENT
PLANS AND SPECIFICATIONS ARE AVAILABLE FOR VIEWING AT OUR OFFICE OR CAN BE DOWNLOADED FROM THE OWNERS WEBSITE. PLEASE CONTACT SWA FOR ANY FUTHER ASSISTANCE AND IF ANY HELP IS NEEDDED IN OBTAINING BONDING, INSURANCE, EQUIPMENT, MATERIALS, OR SUPPLIES
SWA INTENDS TO WORK COOPERATIVELY WITH ALL QUALIFIED FIRMS SEEKING TO WORK ON THIS PROJECT.
WE ARE AN EQUAL OPPORTUNITY EMPLOYER AND WILL CONSIDER ANY AND ALL BIDS THAT MAY BE SUBMITTED
Marshall Harmon
(530) 223-6605
(530) 223-3879
Address
1168 INDUSTRIAL ST.
REDDING, CA 96002
The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »