HP-254 Hunts Point WWTP Dechlorination
20039820
NYC Department of Environmental Protection
1270 Ryawa Avenue Bronx , Bronx County, NY
09/12/2024 at 14:00
Jett Industries, Inc. (Jett - Contractor) is assembling a bid for Contract HP-254: Chlorination   Upgrades Including Structural Slab Rehabilitation at Hunts Point WRRF in the Borough of  Bronx, NY with The New York City Department of Environmental Protection (NYCDEP - Owner) and extends this Request for Quotes (RFQ) to all firms (Bidder) to provide labor, materials, and/or equipment for the Project as described in these bid packages. 
· Access to Bid Documents: 
Project and Scope specific Documents will be posted and updated as required, to the FILES tab of Building Connected. 
· Issuance of Addenda by NYCDEP
Jett will upload to the FILES tab addenda to Building Connected as received by the Owner. A notification through Building Connected will be sent to Bidders. Bidders are required to acknowledge receipt of addenda in writing on Bid Proposal form or their quote.
· Requests for Clarification 
Any Bidder, no later than the date posted on the Project Information Page, may submit questions for interpretation or clarification of, or addenda to, this Bid. All requests must be submitted in writing and sent by email or as a message through Building Connected
· DBE Goal: 
This project has a 20% DBE participation goal. Kiewit Infrastructure Co. encourages disadvantaged business enterprise (DBE) firms to quote our projects.  We also encourage subcontractors and materials suppliers who contract with our firm to utilize DBE subcontractors and vendors for work to be performed. 
· The Project includes the following Work: 
1. Chlorination Facility Improvements: Upgrade of the existing chlorination system and building to improve the chlorination process. Major improvements   include new/ improved sodium hypochlorite dosing location, structural slab replacement, new process mechanical, HVAC, electrical, instrumentation and controls, and plumbing equipment.
2. Interim Disinfection System: Plant operations will be maintained during   construction using an Interim Disinfection System. The Interim Disinfection   System will be in place prior to the existing system going 
offline for the construction of the new system. The Interim Disinfection   System will utilize the new dosing/ mixing location upstream of the   Chlorination Building, the Interim Disinfection sodium hypochlorite tanks   will be located on the driveway to the loading dock, and the pumps will be   located within the storage room of the Chlorination Building. 
3. Chlorine Contact Tank (CCT) Improvements: Repair of the CCTs to improve   flow management.
Scopes of Work Needed: 
*Janitorial  * Job Trailers  *Progress Photos  *Site Safety   *Hazardous   Material Abatement  *Hazardous Material Sampling   *Soil Sampling       *Concrete Accessories   *Concrete Pumping  *Concrete   Repair / Rehab       *Formwork   *Readymix Concrete  *Rebar  *Masonry  *Misc Metals  *FRP /   Fiberglass Construction   *Membrane Roofing  *Glass / Glazing  *Metal Doors  *Acoustical   Ceilings   *Painting  *Toilet / Bath   Accessories       *Fire   Sprinklers / pumps   *Plumbing  *HVAC  *Aggregates  *Dewatering       *On Site   Trucking / Truck & Disposal   *Street Sweeper *Vac Truck       *Asphalt Paving   *Flatwork /   Curb / Gutters   *Landscaping   *Utilities
Project Information: 
Union preferred
PLA included
Davis-Beacon prevailing wage requirement
BABA and AIS requirements 
Drawings & Specifications
Contract documents, including plans & specifications can be viewed and downloaded at: 
https://app.buildingconnected.com/public/545c695dc26ca11600879dd8
The Bidder will be required to quote in compliance with all project plans and specifications. Non-Disclosure Agreements are provided when applicable. Addenda is posted and notification is sent to all invited bidders.
Insurance Requirements
Upon award, Subcontractors must provide insurance in accordance with our subcontract agreement. A copy of the subcontractor agreement can be found in Building Connected  Project Plan Room.
Bonding Requirements
For subcontracts the Bidder shall furnish Performance and Payment Bonds equal to the full subcontract price. For Material Contracts, the bidder shall furnish Supply Bonds in amount equal to full Material Contract price. Bond premiums are reimbursable by Kiewit/Mass. Electric Construction Co. Jett Industries Inc. 
Please provide current bond rate with Quote/Proposal or advise if you are unable to bond so that we my address this issue.
Submission of Proposals & Quotes
Proposals & Quotes from Contractors & Suppliers must be submitted on or prior to bid due date listed above. You can submit your quote three (2) ways:
1) Upload your proposal to Building Connected 
2) E-mail your quote/ proposal to Project Estimator Listed or procurementwcl@kiewit.com
How to get in touch
Outreach Coordinator
Patricia Salmon
323-574-2432
Project Estimator
Ben Freidel     
Ben.freidel@kiwit.com     Telephone 347-865-3454 
470 Chestnut Ridge Road
Woodcliff Lake, NJ 07677
https://app.buildingconnected.com/public/545c695dc26ca11600879dd8
Tricia Salmon
Ben Freidel   ben.freidel@kiewit.com  347-865-3454
					
					
					Telephone
					
(323) 574-2432
(000) 000-0000
				
					Address
					
470 Chestnut Ridge Road
					Woodcliff Lake, NJ 7677
          The U.S. Department of Transportation-supported Northeast Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
          
          Learn more »