Kingsborough Community College Maritime Technology Department Waterfront Reconstruction and Asbestos Abatement


Bid/Contract #

DASNY #3263209999/CR# 33


Awarding Agency

DASNY


Project Location

Coney Island, Kings County County, NY


Bid Date

06/25/2024 at 05:00


Project Details

TCC is currently bidding the following project. Detailed Project Information:
Location: 2001 Oriental Boulevard Brooklyn, NY 11235
Owner: CUNY / Kingsborough Community College (DASNY - Dormitory Authority of the State of New York)
NY STATE MBE Goal: 18%
NY STATE WBE Goal: 12%
NY STATE SDVOB Goal: 6%
Anticipated NTP: July 2024
Anticipated Project End Date: March 2025
Delivery Materials: T-Port Jersey / Optional - direct to project site
UNION PROJECT w/ PLA

We're looking for quotes for the following trades or materials.
SUBCONTRACTOR:
1. Site Civil Work
2. Plumbing
3. Electrical Work
4. Asbestos Abatement
5. Dive Work
6. Painter


Documents can be accessed here: https://trevcon.box.com/s/98si1pe9agiikgdhnu9s3ebn7ir4jmu3

1. SITE CIVIL WORK:

Scope Of Work:
Installation & removal Temporary Construction Barrier
Installation & removal Temporary Construction Entrance
Installation & removal Temporary Construction Fence
Removal & Installation of Topping/Foundation Slabs
Removal & Installation of Pavement
Removal & Installation of Curb
Removal & Installation of Railing

Multiple Drawings & specifications.

2. PLUMBING

Scope Of Work:
Demolition existing Plumbing, Protect Existing utilities, Remove Valves, Remove underground CW main pip, 4" RPZ
Hot box enclosures, 4" Underground Main (Type K), CTE, 12", 1" UV Resistant PVC Piping, 1 1/2" UV Resistant PVC Piping, 2" UV Resistant PVC Piping, 2 1/2" UV Resistant PVC Piping, 4" UV Resistant PVC Piping, 12" CW pipe inclusive Excavation & backfill, 2 1/2" Flex hose Quick Disc, 4" UV Resistant PVC Piping, 2" Drain pipe, 2 1/2" V.C.O, Hobox with vac bkr, vlv, Curb Valve/ Drain valve
Dieelectric Sleeve, Heat trace, Testing, Insp

Applicable Specs Attached: Division 22 Plumbing
Drawings: P.36 thru 41:
DWG P-001.00 - Plumbing General Notes
DWG P-101.00 - Plumbing Removals Plan
DWG P-201.00 - Plumbing Waterfront East Plan
DWG P-202.00 - Plumbing Waterfront West Plan
DWG P-301.00 - Plumbing Flow Diagram
DWG P-302.00 - Plumbing Details

3. ELECTRICAL CONTRACTOR

Scope Of Work:
Demolition of existing Electrical, Protect Existing utilities, Guard Shack Elec Connection, 600A 120/208, 3P, 4W Main D, Sea Tech Docksider PP-30, Sea Tech Docksider PP-50, Sea Tech Docksider PP-100, Marina Elec Equipment FS102, Dist Fdrs 4" RGS PVC Coated, Dist Fdrs #350, Dist Fdrs #2/0, Dist Fdrs Concrete, Dist Fdrs Exc & backfill, LTG Ductbnk 1" RGS/PVC 40Mi, LTG Ductbnk #8, LTG Ductbnk #10, LTG Ductbnk Concrete, LTG Ductbnk Exc & backfilling, Branch Circ 3/4" RGS PVC Co, Branch Circ 1" RGS PVC Coat, Branch Circ 2" RGS PVC Coat, Branch Circ 3" RGS PVC Coat, Branch Circ 3/4" RGS PVC Co, Branch Circ 1" RGS PVC Coat, Branch Circ 2" RGS PVC Coat, Branch Circ 3" RGS PVC Coat, Branch Circ #12, Branch Circ #10, LTG Fixtures Weatherproof A, LTG Fixtures Work Lights, LTG Control 30A Lighting Co, LTG Control Photocell, Power and Connection to ADA, Re-route Secuirty
Coordinate Shutdowns, Core Drill, Shop Drawings, As-Builts, Permits, Temp Power System

4. ASBESTOS CONTRACTOR

Scope Of Work: Demolition of the Guard Shelter

All information to be found in the Spec Book.
028600 - Identification & Disposal Of Hazardous Waste

5. DIVE CONTRACTOR

Scope is the following:
Installing approximately 49 zinc anodes (150lbs each - 4" x 4" x 36") on the existing bulkhead wall.
Anodes need to be installed at minimum 3" below MLLW.
provide all materials, welding rods and anodes - no testing required at this point.
All clamps, plates, shelf angles... need to be Stainless Steel
All Steel components will be coated with splash zone epoxy compound after install
The goal is to come with a trailer-based dive spread and dive from onshore. You also need to provide a certain pulley system to lower down the anodes at the desired locations. Your dive operation needs to be completely independent from Trevcon's operation.

Detail of the anodes is shown on page 31 - DWG S-205.00 (Typical Details)
There is no dedicated spec for the cathodic protection scope. - we have requested this within the RFI's.

6. PAINTER
Scope of Work:

Spot Repairs of existing piles for pile extensions - Band of 2ft tall after splice is completed - 12” DIA pile - 6.5sf per pile - 10 piles extensions => 65 SF of spot repairs
Spot Repairs of existing Bulkhead - MLW to Pile Cap - they listed 4,850 SF but probably more like 7,500 SF

Specifications:

Trevcon will provide work platforms and access to work if necessary - I would suggest either them or us to provides a stripping buggy. Trevcon will provide floating mat containments and turbidity barrier. Sub can stage on land.
Painting spec is attached but looks like it is applicable to Prefabricated steel structures and not to the marine bulkhead - let them know they should reach out with their questions asap.

page 11 - DWG G-110.00

page 26 - DWG S-200.00 - Section S-3
Coatings need to be done per Best Management Practices - we would suggest hydro blasting and afterwards a primer + 2x 8mil coats of fiberglass epoxy (Not CTE as this unacceptable on the rest of the project)

If Interested Contract:

Pete Beck
pbeck@trevcon.com.
Office: 908 580 0200

OR



Get in Touch

Outreach Coordinator

Josh MacDougal


Project Estimator

Orrin Kastelijn

Telephone

(908) 580-0200


Fax

(000) 000-0000

Address

30 Church Street - PO Box 811
Liberty Corner, NJ 7938


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Northeast Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »