DBEGoodFaith.com


FBD Vanguard Construction, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Erin Hutchison

Project Estimator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550


Project Name
Construct retaining wall, replace concrete sidewalk and HMA paving.

Bid/Contract #
02-1H7204

Awarding Agency
California Department of Transportation

Project Location
Redding, Shasta County, CA

Bid Date
01/25/2022 at 14:00

Project Details
FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following items of work including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Temporary Pedestrian Access Route, Portable Changeable Message Sign, Temporary Railing (Type K), Temporary Radar Speed Feedback Sign System, Prepare Water Pollution Control Program, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Concrete Washout, Treated Wood Waste, Reset Metal Bench, Roadway Excavation, Structure Excavation (Retaining Wall), Structure Backfill (Retaining Wall), Pervious Backfill Material, Bonded Fiber Matrix, Compost, Class 2 Aggregate Base, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt (Miscellaneous Area), Remove Asphalt Concrete Pavement, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Structural Concrete, Retaining Wall, Structural Concrete, Drainage Inlet, Architectural Treatment, Bar Reinforcing Steel (Retaining Wall), Concrete Backfill (Pipe Trench), Reinforced Concrete Pipe, Remove Culvert, Remove Inlet, Adjust Inlet, Adjust Grate, Modify Drainage Structure, Modify Inlet, Remove Curb, Remove Concrete Curb And Sidewalk, Pre/Post Construction Surveys, Miscellaneous Iron And Steel, City Water Supply Systems (Relocate Fire Hydrant), Replace And Adjust Fire Hydrant To Grade, Replace Access Box (Utility), Adjust Manhole Frame And Cover (Utility), Lower And Raise Frame And Cover (Utility), Anti-Graffiti Coating, Remove Roadside Sign (Wood Post), Reset Roadside Sign, Relocate Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Roadside Sign - One Post, Cable Railing, Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Remove Thermoplastic Pavement Marking, and Modifying Signal And Lighting Systems.

Engineers Estimate: $2,640,000.00
DBE Goal: 17%
Job Duration: 80 WD

FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available on the Caltrans website at the following link: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=02-1H7204. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

How to get in touch


Outreach Coordinator
Erin Hutchison

Project Estimator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550