DBEGoodFaith.com


Sundt/PCL, A Joint Venture

Is seeking qualified DBEs, MBEs, WBEs, SBEs, SBA MBEs, SDBs, SBA SDVOBs, SBA VOBs, WOSBs



Outreach Coordinator
Savanna Auay-Fuay

Project Estimator
Tom Auay-Fuay @ tauayfuay@sundt.com

Telephone
(480) 293-3288

Fax
(000) 000-0000

Address
1970 N. Redwood Rd.
Salt Lake City, UT 84116


Project Name
Salt Lake City Department of Public Utility - New Water Reclamation Facility Project

Bid/Contract #
524905391 & 524905271

Awarding Agency
Sundt/PCL, A Joint Venture

Project Location
Salt Lake City, Salt Lake County, UT

Bid Date
10/13/2021 at 14:00

Project Details
Sundt/PCL, a Joint Venture is accepting bids for the SW-2: Standby Power and Substation, defined in the Contract Documents and other associated parts of the work included as part Salt Lake City Department of Public Utilities New Water Reclamation Facility Project. The Project is generally described as new construction of a Water Reclamation Facility located at 1365 W 2300 N, Salt Lake City, UT 84116, as indicated in the Contract Documents.

Sundt/PCL, a Joint Venture, is seeking and encouraging qualified, disadvantaged business Enterprises (DBEs) for all areas as listed below.

This project is receiving funding from the U.S. Environmental Protection Agency (EPA) Water Infrastructure Finance and Innovation Act (WIFIA) loan program. As such, an entity who wants to be considered as a DBE must meet the requirements of Title 40 Part 33 - Participation by Disadvantaged Business Enterprises in United States Environmental Protection Agency Programs and be certified by EPA as a qualified DBE. Qualified DBEs must complete Section 4.0 MBE/WBE/DBE/DVBE/HUB Participation on Attachment 2_Scope Bid Form.xlsx. Sundt/PCL will verify certification through the Office of Small Business Programs (OSBP) Small Business Vendor Profile System (SBVPS).

The participation goals for Minorities and Females are established as a percentage participation rate, expressed in percentage terms for the Sundt/PCL aggregate workforce in each trade on all construction work. The Goals for Females is a nationwide goal of 6.9%. The Goals for Minorities for the "economic area" of the Salt Lake City-Ogden, UT covered area and is 6.0%.

ALL entities are expected to comply with the federal regulations pursuant to WIFIA loan program requirements referenced in Exhibit I. Several of these federal regulations include, but are not limited to:
a. Davis-Bacon Wage Requirements
b. American Iron and Steel (AIS) Requirements
c. Disadvantaged Business Enterprise (DBE) Requirement
d. Federal Nondiscrimination, Civil Rights, and EEO Requirements
e. Federal Lobbying Restrictions

* Disadvantaged business enterprise (DBE) means an entity owned or controlled by a socially and economically disadvantaged individual as described by Public Law 102-389 (42 U.S.C. 4370d) or an entity owned and controlled by a socially and economically disadvantaged individual as described by Title X of the Clean Air Act Amendments of 1990 (42 U.S.C. 7601 note); a Small Business Enterprise (SBE); a Small Business in a Rural Area (SBRA); or a Labor Surplus Area Firm (LSAF), a Historically Underutilized Business (HUB) Zone Small Business Concern, or a concern under a successor program.

Debarment and Suspension, Executive Order 12549, 51 FR 6370, February 21, 1986: Contractor certifies that it will not knowingly enter into a contract with anyone who is ineligible under the 40 CFR Part 32 to participate in the Project. Suspension and debarment information can be accessed at http://www.sam.gov. Contractor represents and warrants that it has or will include a term or conditions requiring compliance with this provision in all of its subcontracts under this Agreement.

New Restrictions on Lobbying, 31 USC 1352: All contractor who anticipates working on this project must be registered with htttp://www.sam.gov prior to receiving a contract on this project. Sundt/PCL respectfully request that you register prior to submitting a bid.

The following are scopes associated with this Work Package:

1. ONLY SCOPE OF WORK NOTED ON DRAWINGS AS SW-2 IS INCLUDED IN THIS CONTRACT PACKAGE.
2. Ancillary project controls and work as defined in the General Conditions and Division 01 specifications not explicitly listed below.
3. Clearing and grubbing, site preparation, asphalt and concrete demolition, and general construction area preparation.
4. Demolition and removal of existing conflicting utilities and associated utility relocations.
5. Foundation and soil preparation.
6. Installation of foundation for Electrical Substation and Standby Power structures and equipment.
7. Construction of Electrical Substation, Standby Power, and appurtenances.
8. Installation of Electrical Substation and Standby Generators equipment, components, devices, supports, structures, cables, and terminations.
9. Coordination with Rocky Mountain Power (RMP) for bringing power to the substation, connection of the substation to the new RMP feeder, and other related coordination activities.
10. Startup and commissioning activities for the Electrical Substation and the Standby Power.
11. Paving and grading and installation of site improvements associated with the Electrical Substation and the Standby Power.
12. Construction of vehicle fueling station and associated appurtenances.
13. Associated site utility works including but not limited to electrical, stormwater, sludge, waste drains, utility water, and air for the facilities included in the construction package.

Please note that Sundt/PCL will be self-performing the listed scopes below. We are requesting materials bid associated with the following scopes:

1. Cast In Place Concrete
2. Structural Steel and Miscellaneous Metals Installation
3. Structural Excavation and Backfill
4. Site Grading
5. Site piping Installation
6. Sundt/PCL will purchase and set the following equipment.:
a. Fabricated Electrical House
b. Facility Aboveground Diesel Fuel-Oil Storage Tanks
c. Engine Generators

Bids are due no later than 2:00 PM MST, October 13, 2021. Bidding documents can be obtained by contacting Sundt/PCL at tauayfuay@sundt.com. Please do not contact Owner or Engineer. All questions to be emailed to tauayfuay@sundt.com and are due no later than 21 calendar days prior to bid due date. Procedures for submitting bids, claiming an error, withdrawal of bids and other pertinent information are contained in the Instructions to Bidders. Sundt/PCL and Owner reserves the right to reject any or all bids.

How to get in touch


Outreach Coordinator
Savanna Auay-Fuay

Project Estimator
Tom Auay-Fuay @ tauayfuay@sundt.com

Telephone
(480) 293-3288

Fax
(000) 000-0000

Address
1970 N. Redwood Rd.
Salt Lake City, UT 84116