We are seeking quotes for cathodic protection and electrical
The project consists of demolishing and replacing an existing steel tank floor; installing cathodic protection systems both inside and outside of the tank; full recoating of the interior and exterior of the tank; replacement of the existing base sand with a transported neutral sand; and installation of concrete footings under the existing columns
Insurance is required.
Documents may be examined, downloaded and printed online via the Farr West Engineering PlanetBids portal https://pbsystem.planetbids.com/portal/48213/portal-home