DBEGoodFaith.com


Shimmick Construction Company, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Trina Clay

Project Estimator
Dan Sparks

Telephone
(949) 333-1517

Fax
(949) 333-1510

Address
530 Technology Drive, Suite 300
Irvine, CA 92618


Project Name
Port of Los Angeles Pier 400 Corridor Storage Tracks Expansion

Bid/Contract #
Specification No. 2805

Awarding Agency
Port of Los Angeles

Project Location
Los Angeles, Los Angeles County, CA

Bid Date
08/17/2021 at 14:45

Project Details
Shimmick Construction Company, Inc. is a Prime Contractor requesting bids from California certified DBE firms. Subcontractors/Professional Services/Suppliers for the following project:

Port of Los Angeles Pier 400 Corridor Storage Tracks Expansion- Specifications No. 2805
Bid date & time: August 17, 2021 @ 2:45pm

General work description: Project consists of improvements at the Pier 400 Rail Storage Yard and Bridge. Work includes construction of rail tracks, railroad signalization, compressed air equipment and system, access roadway and rail bridge; installation of prestressed concrete piles and stone columns; handling and disposal of contaminated soil; utility modifications, and other improvements.

Scopes of work requested, but not limited to the following: Sand & Gravel Suppliers, Concrete & Cement Suppliers, Paving Asphalt, Furnish & Drive Pile, CIDH Concrete Piling, Prestressing Concrete CIP, Rebar, Waterproofing, Sign Structure, Roadside Sign, Railroad Work, Alternate Pipe Culvert, Reinforced Concrete Pipe, Filter Fabric, Plastic Pipe, Clay Sewer Pipe, Sewer Manhole, Curb & Gutter, Drainage, Misc. Iron, Steel & Bridge Metal, Fencing, Signs & Lighting, (Message Signs, Lighting), Land Survey, SWPPP, Water Trucks, Sweepers, and Trucking.

Shimmick Construction has listed scopes of work that can be broken down into economically feasible packages to encourage participation. Shimmick will conduct ourselves in good faith with all firms participating on the project.

This project is subject to the Port-Wide Project Labor Agreement (PLA)
Please note there are forms that are required from all subcontractors whose packages are over $100,000. These forms can be found in Folder 8 "REQUIRED FORMS". We request these documents by COB August 16th, but they are due no later than with your quote.

Shimmick Construction Company, Inc. 530 Technology Drive, Suite 300, Irvine, CA 9261
Office Phone: (949) 333-1500 Fax: (949) 333-1510

Send all quotes and/or questions regarding to this project to email estimating.southwest@shimmick.com

Contract documents are available: in the Department's Web-based Bid Management System called "The Construction Division Business Opportunity Network (CDBON)" utilizing an online bid management system at https://www.portoflosangeles.org/business/contracting-opportunities/constructionbids. Bidders will be required to register to download Drawings, Specifications, Addenda, and other important documents. A plan holders list can be accessed without registering. For information concerning bids, call the Department at (310) 732-3522. The plans and specifications are also available through our SmartBidNet https://securecc.smartinsight.co/#/PublicBidProject/592474 if you require assistance with access to plans/specs, bonding assistance or contract requirements please contact Trina Clay at tclay@shimmick.com or at 949-333-1517.

CONTRACTOR REGISTRATION REQUIREMENTS: Labor Code Section 1771.1 (a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.

Bids submitted will confirm the acceptance of the terms and conditions of SCCI's Standard Long Form Subcontract or Purchase Order, available upon request. A Subcontractor/Supplier providing a proposed bid/price will be viewed as accepting SCCI's Standard Long Form Subcontract or Purchase Order-100% Performance and Payment bonds are required for subcontractors, material bonds are required from all suppliers. Shimmick Construction will pay bond premium up to 2%. Subcontractors/Suppliers will be required to abide by terms and conditions of the AGC Master Labor Agreements. All proposers are bound to the prime contract terms and conditions, including payment provisions. Insurance coverage is required as set by the prime contract and/or Shimmick Construction - whichever is greatest. Minimum insurance requirements: General Liability $1M-Per Occurrence/$2M-Agg/$2M-Completed Operations; Excess Liability $5M; Auto Liability $1M; Workers Comp & Employer Liability $1M. The listing of a Subcontractor/Supplier is not to be construed as an acceptance of all of the conditions or exceptions included with the price quote. Shimmick requires that Subcontractor & Supplier price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. For assistance with bonding, insurance or lines of credit contact Trina Clay at tclay@shimmick.com or 949-333-1517.

Shimmick Construction Company, Inc. is An Equal Opportunity Employer

How to get in touch


Outreach Coordinator
Trina Clay

Project Estimator
Dan Sparks

Telephone
(949) 333-1517

Fax
(949) 333-1510

Address
530 Technology Drive, Suite 300
Irvine, CA 92618