DBEGoodFaith.com


Walsh Construction Company II, LLC

Is seeking qualified DBEs



Outreach Coordinator
Maria Villegas

Telephone
(951) 336-7040

Fax
(951) 336-7041

Address
1260 Corona Pointe Court Suite 201
Corona, CA 92879


Project Name
ADOT Chinle Wash

Bid/Contract #
91 AP 469 H894501C

Awarding Agency
ADOT - Arizona Department of Transportation

Project Location
Chinle, Apache County, AZ

Bid Date
06/18/2021 at 8:00

Project Details
The proposed project is located in Apache County on U.S. 191 between Mileposts 469.90 and 488.56, within Navajo Nation, approximately 22 miles north of the community of Chinle, Arizona. Traffic Control Furnish & Install, Project Controls (Scheduling, Site Survey, QC etc.), Remove Slope Pavement, Curb & Gutter, Remove HMA Pavement, Facilities, Remove Fence, Remove Signs, Sign Foundations and Post, Water Pollution & Erosion Control, Earthwork & Embankment, PCC Pavement, Concrete Saw, Seal, Grinding, Bridge Deck Grind & Groove, Asphalt Paving and Related, Concrete Curb, Gutter, Sidewalks & Driveway, Survey. Quality Control, Site Fencing, Metal Beam Guard Rail & Median Cable Railings, Erosion Control & Seeding, Electrical, Reinforcing Steel, Bridge Structures, CIDH and Related, Trucking, Water Truck, Street Sweeping.

Plans and specifications can be requested by emailing your request to socalwalsh@walshgroup.com or calling (951) 336-7040. Archer Western Construction is requesting pricing for all items of work on the project. Subcontractors and suppliers are required to submit price quotes to us within a reasonable time prior to the bid date, in order to fully evaluate quote. Registration in the UTRACS system is required. Information can be obtained at the AZTRACS website: https://utracs.azdot.gov/AzUtracsRegistration/ . 100% performance bonds may be required for the full subcontracted amount. Subcontractors must possess a valid Arizona Contractor's license, and current insurance. Subcontractor's will be required to sign a standard subcontract agreement. This is a Federally funded project with a DBE goal of 4.42%. Please call our office if you will need assistance in obtaining bonding, lines of credit, insurance, equipment, materials, or delivery schedules. Please contact our office if you are interested in this project. Archer Western Construction will work cooperatively with all qualified firms seeking to work on this project. All quotes must include State License number, and DBE certification number.

How to get in touch


Outreach Coordinator
Maria Villegas

Telephone
(951) 336-7040

Fax
(951) 336-7041

Address
1260 Corona Pointe Court Suite 201
Corona, CA 92879