DBEGoodFaith.com


James W. Fowler Co.

Is seeking qualified MBEs, WBEs



Outreach Coordinator
Sonja Sommerfeldt

Project Estimator
Todd Pittman

Telephone
(503) 623-5373

Fax
(503) 623-9117

Address
12775 Westview Drive
Dallas, OR 97338


Project Name
South Park Drainage and Roadway Partnership

Bid/Contract #
PW# 2020-044

Awarding Agency
City of Seattle

Project Location
Seattle, King County, WA

Bid Date
04/28/2021 at 02:00

Project Details
This Project consists of the following elements of Work:
Drainage and Roadway (Bid Schedule 1): Construction of 4,020 LF of mainline storm drain pipe, drainage structures, roadway pavement to include channelization, signing, and lighting; sidewalks, curb ramps, curb and gutter, associated site preparation, contaminated soil removal,
dewatering, and landscaping.
Water Main (Bid Schedule 2): Construction of 1,270 LF of earthquake resistant ductile iron water pipe and associated improvements.
Additive Roadway (Bid Schedule 3): Construction of HMA roadway pavement along one block of 5th Ave S between S Kenyon Street and S Monroe St, to include associated catch basins and piping, sidewalks, curb ramps, curb and gutter, site preparation, contaminated soil removal,
dewatering, and landscaping.

SUBCONTRACTORS - flagging/traffic control; demolition; rebar; cast-in-place concrete; grouting; concrete cutting & boring; saw cutting; coating/painting; signage; electrical; clearing & grubbing; fill & backfill; excavation; dewatering; erosion control; asphalt paving; curbs, gutters, & sidewalks; pavement markings; fencing; landscaping; trucking (dump trucks); dechlorination/chlorination.

SUPPLIERs - concrete; aggregate.

Engineer's Estimate: $17,000,000

Participation Goals: WMBE - 21%

James W. Fowler Co. is an equal opportunity employer and we are requesting qualified subcontractor and supplier bids from all interested firms, including minority, women, and other business enterprises. Where economically feasible, we are willing to divide total contract requirements into smaller portions or quantities to permit maximum participation by WMBE firms. Please contact us to discuss opportunities available.

James W. Fowler Co. will assist WMBE subcontractors in obtaining necessary equipment, supplies, or materials. We are also available to provide assistance in obtaining bonding, lines of credit and/or insurance to WMBE subcontractors. Please complete all negotiations 24-hours prior to bid opening. We also encourage the utilization of apprentices for this project.

Bid documents can be obtained from the City of Seattle or from James W. Fowler Co. The plans and specs are available at no cost on the James W. Fowler Co. website at jwfowler.com. For more information, please contact James W. Fowler Co. at (503) 623-5373. Quotes may be faxed to (503) 623-9117 or emailed to estimating@jwfowler.com.

Please follow the below link for plans, specifications, and addenda issued for this project:

http://www.jwfowler.com/bidopportunities/

How to get in touch


Outreach Coordinator
Sonja Sommerfeldt

Project Estimator
Todd Pittman

Telephone
(503) 623-5373

Fax
(503) 623-9117

Address
12775 Westview Drive
Dallas, OR 97338