DBEGoodFaith.com


FBD Vanguard Construction, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550


Project Name
Remove raised island, construct concrete barrier and install lighting. In L0s Angeles County In Los Angeles From 0.1 Mile East Of Arlington Avenue Overcrossing To 0.7 Mile East Of Route 10/110 Separation

Bid/Contract #
07-332604

Awarding Agency
Cal Trans

Project Location
Los Angeles, Los Angeles County, CA

Bid Date
12/03/2020 at 02:00

Project Details
LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, PORTABLE CHANGEABLE MESSAGE SIGN (EA), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, PREPARE STORM WATER POLLUTION PREVENTION PLAN, TEMPORARY COVER, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), ROADSIDE CLEARING, SOIL AMENDMENT, SLOW-RELEASE FERTILIZER, PLANT (GROUP H), PLANT (GROUP B), PLANT ESTABLISHMENT WORK, WOOD MULCH, CHECK AND TEST EXISTING IRRIGATION FACILITIES, CONTROL AND NEUTRAL CONDUCTORS, 1 1/2" REMOTE CONTROL VALVE, 24-32 STATION IRRIGATION CONTROLLER (WALL MOUNTED), RISER SPRINKLER ASSEMBLY (GEAR DRIVEN), RISER SPRINKLER ASSEMBLY, 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), BALL VALVE, , HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), 54" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), 60" CAST-IN-DRILLED-HOLE CONCRETE PILE (SIGN FOUNDATION), CLEAN EXPANSION JOINT, JOINT SEAL (TYPE AL), FURNISH SIGN STRUCTURE (TRUSS), INSTALL SIGN STRUCTURE (TRUSS), REMOVE SIGN STRUCTURE WALKWAY (EA), REMOVE SIGN STRUCTURE ), PREPARE CONCRETE BRIDGE DECK SURFACE, REFINISH BRIDGE DECK, TREAT BRIDGE DECK, FURNISH BRIDGE DECK TREATMENT MATERIAL, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION), LOCATION B, BRIDGE REMOVAL (PORTION), LOCATION C, 24" REINFORCED CONCRETE PIPE, REMOVE PIPE , REMOVE INLET, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN (WOOD POST), REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD), REMOVE ROADSIDE SIGN PANEL, REMOVE SIGN FROM SIGN FRAME, FURNISH FORMED PANEL SIGN (OVERHEAD), FURNISH LAMINATED PANEL SIGN (1"-TYPE A), FURNISH LAMINATED PANEL SIGN (1"-TYPE B), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED), METAL (BARRIER MOUNTED SIGN), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL SIGN PANEL ON EXISTING FRAME, INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, INSTALL ROADSIDE SIGN PANEL (BARRIER MOUNTED), REUSABLE CRASH CUSHION, REMOVE GUARDRAIL, REMOVE CRASH CUSHION, REMOVE CRASH CUSHION (SAND FILLED), 6" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 12-3), THERMOPLASTIC PAVEMENT MARKING, 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 18-12), PAINT TRAFFIC STRIPE (2-COAT), REMOVE PAINTED TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, TEMPORARY MICROWAVE VEHICLE DETECTION SYSTEMS, MODIFYING LIGHTING SYSTEMS, MODIFYING RAMP METERING SYSTEMS, MODIFYING CHANGEABLE MESSAGE SIGN SYSTEMS, READY MIX CONCRETE SUPPLIER

FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

How to get in touch


Outreach Coordinator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550