DBEGoodFaith.com


FBD Vanguard Construction, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550


Project Name
Construct JPCP, CRCP, and approach slabs, In San Joaquin County In Stockton On Route 4 From 0.2 Mile East Of Fresno Avenue To El Dorado Street And On Route 5 From Taylor Street Overhead To Stockton Channel Viaduct

Bid/Contract #
10-1C5004

Awarding Agency
CAL TRANS

Project Location
STOCKTON, SAN JOAQUIN County, CA

Bid Date
11/04/2020 at 02:00

Project Details
LEAD COMPLIANCE PLAN; CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM; TYPE III BARRICADE; TEMPORARY TRAFFIC STRIPING; CHANNELIZER; PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY; PORTABLE CHANGEABLE MESSAGE SIGN; TEMPORARY AUTOMATED END OF QUEUE WARNING SYSTEM; END OF QUEUE MONITORING/ WARNING WITH TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY; TEMPORARY RAILING; TEMPORARY CRASH CUSHION MODULE; TEMPORARY ALTERNATIVE CRASH CUSHION SYSTEM; TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM; SWPP, TEMPORARY EROSION CONTROL; TEMPORARY MULCH; TEMPORARY DRAINAGE INLET PROTECTION; TEMPORARY FIBER ROLL; STREET SWEEPING; TEMPORARY CONCRETE WASHOUT; ASBESTOS COMPLIANCE PLAN; REMOVE THERMOPLASTIC STRIPE; TREATED WOOD WASTE; CLEARING AND GRUBBING; ROADWAY EXCAVATION; STRUCTURE EXCAVATION; STRUCTURE BACKFILL; WOOD MULCH; ISOLATION JOINT SEAL; GRIND EXISTING CONCRETE PAVEMENT; DRAINAGE INLET; CLEAN EXPANSION JOINT; JOINT SEAL; REMOVE CONCRETE DECK SURFACE;PREPARE CONCRETE BRIDGE DECK SURFACE; POLYESTER CONCRETE OVERLAY; CORE CONCRETE; PAINT BRIDGE IDENTIFICATION; BRIDGE REMOVAL; CORRUGATED STEEL PIPE; WELDED STEEL PIPE CASING; STEEL FLARED END SECTION; ROCK SLOPE PROTECTION; ROCK SLOPE PROTECTION FABRIC;REMOVE CONCRETE; MISCELLANEOUS IRON AND STEEL; CHAIN LINK GATE; REMOVE PAVEMENT MARKER; PAVEMENT MARKER; REMOVE METAL POST; INSTALL TEMPORARY SIGN OVERLAY; MIDWEST GUARDRAIL SYSTEM; RUBBER VEGETATION CONTROL MAT; DOUBLE MIDWEST GUARDRAIL SYSTEM; SINGLE THRIE BEAM BARRIER; DOUBLE THRIE BEAM BARRIER; TRANSITION RAILING; END ANCHOR ASSEMBLY; ALTERNATIVE IN-LINE TERMINAL SYSTEM; SEVERE DUTY CRASH CUSHION; REMOVE GUARDRAIL; REMOVE METAL RAILING; REMOVE CRASH CUSHION; REMOVE AND REPLACE STRIPING; MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION; MODIFYING LIGHTING SYSTEMS; MODIFYING TRAFFIC MONITORING STATIONS; SUPPLIER FOR READY MIX CONCRETE , ASPHALT , CL 2 BASE

FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. They may also be obtained http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=10-1C5004. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

How to get in touch


Outreach Coordinator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550