DBEGoodFaith.com


FBD Vanguard Construction, Inc.

Is seeking qualified DVBEs



Outreach Coordinator
Denise Ravazza

Project Estimator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550


Project Name
Construct structural concrete bridge & barrier slab; & minor concrete.

Bid/Contract #
10-1F8304

Awarding Agency
Cal Trans

Project Location
Various Locations, Amador County, CA

Bid Date
10/29/2020 at 02:00

Project Details
LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMP STRIPING(TAPE), TEMP PAVEMENT MARKING (TAPE), CHANNELIZER (SURFACE MTD), TEMP PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN, TEMP RAILING (TYPE K), ALTERNATIVE TEMP CRASH CUSHION, SWPP, TEMP DRAINAGE INLET PROTECTION,TEMP CONCRETE WASHOUT, TEMP HIGH-VISIBILITY FENCE, CLEARING/GRUBBING, ROADWAY EXCAVATION, WOOD MULCH, BONDED FIBER MATRIX, FIBER ROLL, COMPOST, REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE F), REMOVE ASPHALT CONCRETE DIKE, GRIND EXISTING CONCRETE PAVEMENT, GRIND EXISTING BRIDGE DECK, DRILL AND BOND DOWEL, BAR REINFORCING STEEL (EPOXY COATED, BRIDGE), SPOT BLAST CLEAN/PAINT UNDERCOAT, CLEAN/PAINT BRIDGE RAILING, PUBLIC SAFETY PLAN, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION) LOCATION B, BRIDGE REMOVAL (PORTION) LOCATION C, ADJ INLET, DETECTABLE WARNING SURFACE, PRE/POST CONSTRUCTION SURVEYS, PREPARE AND STAIN MARKER, PAVEMENT MARKER (RETROREFLECTIVE), RECONSTRUCT METAL RAILING (BRIDGE), THERM STRIPING/MARKING, (ENHANCED WET NIGHT VISIBILITY) REMOVE THERMO STRIPE, REMOVE THERMO PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS, AND MODIFYING SIGNAL/LIGHTING SYSTEMS

FBD Vanguard Construction Inc. can assist in payment of a reasonable bond premium. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

How to get in touch


Outreach Coordinator
Denise Ravazza

Project Estimator
Jason Muller

Telephone
(925) 245-1300

Fax
(925) 245-1244

Address
550 Greenville Road
Livermore, CA 94550