Is seeking qualified DBEs
Outreach Coordinator
Barbara Sasser
Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com
Telephone
(707) 455-7033
Fax
(707) 455-7036
Address
3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688
Project Name
Construction on Highway 80 in Roseville at the Atlantic Street on Ramp
Bid/Contract #
03-0H4604
Awarding Agency
State of California, Department of Transportation
Project Location
Roseville, Placer County, CA
Bid Date
10/27/2020 at 02:00
Project Details
Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:
LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (LS), DISPUTE RESOLUTION ADVISOR ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION- ADVISOR-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PLASTIC TRAFFIC DRUMS, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY EROSION CONTROL BLANKET, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY REINFORCED SILT FENCE, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION ROADWAY, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, ASBESTOS COMPLIANCE PLAN, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (LS), NATURAL RESOURCE PROTECTION PLAN, BIRD EXCLUSION DEVICE, BIOLOGICAL RESOURCE INFORMATION PROGRAM, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, STRUCTURE EXCAVATION (BRIDGE), STRUCTURE EXCAVATION (RETAINING WALL), STRUCTURE BACKFILL (BRIDGE), STRUCTURE BACKFILL (RETAINING WALL), PERVIOUS BACKFILL MATERIAL (RETAINING WALL), DITCH EXCAVATION, IMPORTED BORROW (CY), GEOSYNTHETIC FILTER FABRIC, CHECK AND TEST EXISTING IRRIGATION FACILITIES, CONTROL AND NEUTRAL CONDUCTORS, 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, MOVE-IN/MOVE-OUT (EROSION CONTROL), BONDED FIBER MATRIX (SQFT), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH (FRM), FIBER ROLLS, HYDROSEED (HBGM), COMPOST (CY), INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE (CY), ASPHALT TREATED PERMEABLE BASE, HOT MIX ASPHALT (TYPE A), TEXTURED AND COLORED HOT MIX ASPHALT PAVING, HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE F), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, FURNISH STEEL PILING (HP 14 X 117), DRIVE STEEL PILE (HP 14 X 117), PRESTRESSING CAST-IN-PLACE CONCRETE, STRUCTURAL CONCRETE, BRIDGE FOOTING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), STRUCTURAL CONCRETE, RETAINING WALL, STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N), STRUCTURAL CONCRETE, DRAINAGE INLET, MINOR CONCRETE, JOINT SEAL (MR 1 1/2"), BAR REINFORCING STEEL (BRIDGE), BAR REINFORCING STEEL (RETAINING WALL), BRIDGE REMOVAL, 24" PLASTIC PIPE, 18" CORRUGATED STEEL PIPE (.109" THICK), 3" PLASTIC PIPE (EDGE DRAIN), 3" PLASTIC PIPE (EDGE DRAIN OUTLET), DRAINAGE INLET MARKER, 18" ALTERNATIVE FLARED END SECTION, 24" ALTERNATIVE FLARED END SECTION, ABANDON CULVERT (LF), REMOVE CULVERT (LF), REMOVE FLARED END SECTION (EA), CAP INLET, CULVERT SLURRY-CEMENT BACKFILL, REMOVE ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), DETECTABLE WARNING SURFACE, MINOR CONCRETE (CURB AND GUTTER), MINOR CONCRETE (SIDEWALK), MINOR CONCRETE (CURB RAMP), REMOVE CONCRETE SIDEWALK (SQYD), REMOVE CONCRETE (CURB AND GUTTER), PRE/POST CONSTRUCTION SURVEYS, MISCELLANEOUS IRON AND STEEL, TEMPORARY FENCE (TYPE CL-6), CHAIN LINK FENCE (TYPE CL-6), REMOVE FENCE, REMOVE PAVEMENT MARKER, DELINEATOR (CLASS 1), CONCRETE BARRIER DELINEATOR (16 INCH), PAVEMENT MARKER (RETROREFLECTIVE), TREATMENT BEST MANAGEMENT PRACTICE MARKER,REMOVE ROADSIDE SIGN, RESET ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), ROADSIDE SIGN - ONE POST, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE),TRANSITION RAILING (TYPE WB-31), END CAP (TYPE A), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 842), REMOVE GUARDRAIL, 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6- 1), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC CROSSWALK AND PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 12" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE PAINTED TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT STRIPE (WATER BLASTING), REMOVE THERMOPLASTIC PAVEMENT MARKING (WATER BLASTING), LOCATING AND MAPPING UNDERGROUND FACILITIES, RAMP METERING SYSTEM, TEMPORARY SIGNAL SYSTEMS, MODIFYING SIGNAL AND LIGHTING SYSTEMS, REMOVING SIGNAL AND LIGHTING SYSTEMS, REMOVING RAMP METERING SYSTEMS, MOBILIZATION
All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.
Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Bridgeway's requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.
How to get in touch
Outreach Coordinator
Barbara Sasser
Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com
Telephone
(707) 455-7033
Fax
(707) 455-7036
Address
3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688