DBEGoodFaith.com


Bridgeway Civil Constructors, Inc.

Is seeking qualified DVBEs



Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688


Project Name
Construction on State Route 121 Near Napa at Capell Creek Bridge

Bid/Contract #
04-4J2104

Awarding Agency
State of California, Department of Transportation

Project Location
Near Napa, Napa County, CA

Bid Date
10/15/2020 at 02:00

Project Details
Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:
LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD (WDAY), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), TEMPORARY ALTERNATIVE CRASH CUSHION, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY COVER, TEMPORARY REINFORCED SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY ACTIVE TREATMENT SYSTEM, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, STRUCTURE EXCAVATION (BRIDGE), STRUCTURAL EXCAVATION (RETAINING WALL) TYPE A, STRUCTURE BACKFILL (BRIDGE), STRUCTURE BACKFILL (RETAINING WALL), ROCK SLOPE PROTECTION BACKFILL, EMBANKMENT, SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B2, ROADSIDE CLEARING, SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP H), PLANT (GROUP I), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, MOVE-IN/MOVE-OUT (EROSION CONTROL), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, FIBER ROLLS, COMPOST SOCK, HYDROSEED, COMPOST (CY), INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE (CY), CRACK TREATMENT, PRIME COAT, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), SEAL COURSE CONCRETE, STRUCTURAL CONCRETE, RETAINING WALL, BAR REINFORCING STEEL (RETAINING WALL), INJECT CRACK (EPOXY), REPAIR SPALLED SURFACE AREA, CORE CONCRETE (4"), PAINT BRIDGE IDENTIFICATION, COMPOSITE GIRDER STRENGTHENING, BRIDGE REMOVAL (PORTION), GEOCOMPOSITE DRAIN, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE- RECESSED), TREATMENT BEST MANAGEMENT PRACTICE MARKER, FURNISH SINGLE SHEET ALUMINIUM SIGN (0.063" - UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI), RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN - ONE POST, CABLE RAILING, 6" THERMOPLASTIC TRAFFIC STRIPE, PAINT PAVEMENT MARKING (2-COAT), REMOVE PAINTED TRAFFIC STRIPE, REMOVE PAINTED PAVEMENT MARKING, TEMPORARY SIGNAL SYSTEMS, MOBILIZATION

All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.

Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Bridgeway's requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.

How to get in touch


Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688