DBEGoodFaith.com


Thalle Construction Company Inc

Is seeking qualified DBEs



Outreach Coordinator
Vincent Zannini

Project Estimator
Vincent Zannini - Alex Dos Santos - Jorge Gambini - Tom Barton

Telephone
(919) 241-1635

Fax
(919) 241-1659

Address
900 NC HWY 86 North
Hillsborough, NC 27278


Project Name
TAXIWAY F EXTENSION, DEICING PAD, AND SOUTH CROSSFIELD TAXIWAY AND YORKMONT ROAD REALIGNMENT PROJECT - PACKAGE 1

Bid/Contract #
CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT - Project No. AF018-008

Awarding Agency
THALLE CONSTRUCTION COMPANY

Project Location
Charlotte, Mechlenburg County, NC

Bid Date
09/23/2020 at 02:00

Project Details
OFFER DEADLINE; Respond to Thalle with offer by September 23, 2020 10:00 AM to quotes@thalle.com; fax 919-241-1659 Corp Phone 919.245.1490 Proposals are encouraged to be on company letterhead, with pricing noting scope inclusions or exclusions, bonding % rate/capacity, Business Utilization
MATERIALS & TRADES: Temporary facilities, Traffic-control flagging & gate-security, Surveying, DTM, Settlement Gauges & monitoring, (Instruments by CDIA), Quality control program, Geotech QC Testing Site Perpetration: Erosion Control, slope-drains, Clearing & grubbing, tree removal, Concrete Demo, Gravity Sanitary sewer, and Storm drainage ; RCP, DIP pipe-fittings, Frame and Grates, Precast-drain structures, Cast-in-place-drain structures, Culvert Head-wall & Wing-walls, Box-Culverts, Site-work, earthwork, Geotextile fabric, skimmers, traffic-control devise, barricades, Stone Aggregates, Riprap, Dump-Trucking, reinforcement, Ready-Mix, CLSM, Asphalt Paving in place, Shoulder repair, seeding, Chain Link Fence & gates, Electrical- Airport-lighting System, Duct-Bank conduit, grounding, Underground-power, Taxiway guidance signs,
PROJECT SCOPE: includes 3,330LF Dual Barrel 10'x10' Coffey Creek culvert, & interceptor 3,200LF 30" sanitary sewer line, Detention basin, Duke Energy duct bank, Earthwork and trucking 1.85 M -CY of embankment, and storm drainage system for a future Deicing Pad, Taxiway F Extension, and South Crossfield Taxiway, to be constructed under separate contract.

CONSTRUCTION SCHEDULE: See Appendix, Contract documents, sheets GC0.1 to GC5.01 phasing plans. Notice to Proceed (NTP) MARCH 1ST 2021 - Completion APRIL, 2022 project requires Day and night shift work activities Phase One (NTP+410) : Temporary fence, Clearing & grubbing, Phase 1-Sanitary Sewer Trunk Line (see appendix 3), Coffey Creek culvert (see appendix 3) , Electrical Duct Bank, Storm Drainage, Grading and start surcharging Phase Two: (Phase one +150 Days) - Airside (AOA) construction Taxiway E and A: Temporary Fence, Culvert, Grading, Storm-drainage Phase Three [260] (NTP+580 day) after Phase three - Landside Construction Taxiway U, Temporary Fence, Storm-Drains, Sewer-laterals, Grading
SITE ACCESS & RESTRICTIONS: See Appendix Onsite personnel required to badge per security requirements complete Airport safety & security training, Vehicle and/or equipment driver training program. Vehicles & equipment may only enter airport operation area (AOA) under escort of Airport operations and enter though identified access gates.
CONTRACT COMPLIANCE All contracts & purchase orders will comply with will flow-down project documents requirements, contract clauses, etc not limited to: Site security and restrictions qualification; State & Federal laws and regulations Insurance Coverage, Employment Practices, wage obligation, taxes, Civil Rights Acts, Equal Employment, Business Utilization DBE firms are encouraged to participate & will be listed at time of bid, Work & materials may be combined or divided to facilitate maximum participation. Subcontractors are obliged to sublet to 2nd & 3rd tier DBE subcontractors. DBE firms needing assistance with obtaining bonding, loan capital, lines of credit, insurance, obtaining equipment & supplies materials or negotiate joint venture & partnership arrangements, or for Thalle's payment terms or to apply for pre-approval for agreements or quickpay, may contact Thalle Nan Sumner 919.241.1635 nsumner@thalle.com for assistance. Thalle will negotiate fairly with interested DBE firms & will not reject firms as unqualified without sound reasons-based capabilities.
BID DOCUMENTS can be obtained from Thalle Construction Co by request: including Bid Items Project Special Provisions-Specifications, Plan Drawings, & other documents are available for download or obtained from Thalle office by appointment and other 3rd party sources.
CONTACTS: Thalle Construction Company Inc.900 NC HWY 86 North Hillsborough 27278 phone 919.241.1490 fax 919.241.1659: NC-Branch-Est.Dept quotes@thalle.com : Vincent Zannini 919.241.1635

How to get in touch


Outreach Coordinator
Vincent Zannini

Project Estimator
Vincent Zannini - Alex Dos Santos - Jorge Gambini - Tom Barton

Telephone
(919) 241-1635

Fax
(919) 241-1659

Address
900 NC HWY 86 North
Hillsborough, NC 27278