DBEGoodFaith.com


Garney Pacific Inc

Is seeking qualified DBEs, MBEs, WBEs, DVBEs, Local Subcontractors



Outreach Coordinator
gpiestimating@garney.com

Project Estimator
Matt Roberts

Telephone
(925) 800-1848

Fax
(000) 000-0000

Address
324 E 11th St, Suite E2
Tracy, CA 95376


Project Name
Conveyance Infrastructure Project of the Pure Water Soquel Program

Bid/Contract #
CWO 20-2030

Awarding Agency
Soquel Creek Water District

Project Location
Soquel, Santa Cruz County, CA

Bid Date
10/05/2020 at 12:00

Project Details
Garney Pacific, Inc is proposing on the Conveyance Infrastructure Project of the Pure Water Soquel Program as a Prime General Contractor. We are actively seeking sub-bids on all trades from qualified & certified DBE, DVBE, WBE, MBE, and Local subcontractors & suppliers. The Conveyance Infrastructure Project will consist of the construction of conveyance infrastructure for Source Water, ROC, and Purified Water. The Source Water Pipeline will convey tertiary treated effluent from the Santa Cruz WWTF to the Chanticleer AWPF site; The ROC pipeline will convey the ROC and any reject or excess water to the Santa Cruz TTF along the same alignment of the tertiary treated effluent pipeline where it will terminate at a connection to the outfall; and The Purified Water Pipeline will convey purified water from the AWPF to the SWIP injection wells. The Engineers Estimate is $30,000,000.00 - $40,000,000.00.

Project Documents are available to you for your convenience thru contacting our office via email at gpiestimating@garney.com as well as accessing our plan room with the following link and pin:
https://garneyconstruction.oneteam.build/bidboard/?projno=13056012&pin=056012&ck=2f0740085be232b6519d5a40fcbb5789
Pin: 056012

Alternatively, plans are available for your review at our office or you can send request of interest in this project and we will send you a link to the specs/plans.
Subcontractors are required to meet insurance and labor requirements provided in the project specifications. Subcontractors may be required to provide 100% Payment and Performance Bonds. For assistance with bonding, insurance, or lines of credit please email gpiestimating@garney.com or call our office at 925-800-1848.
Qualified firms must submit the required documentation as listed:
SBC Certification
Copy of CSLB
Proof of DIR Registration (including number)
All proposals are required to be in accordance with the plans, specifications until completion of contract. Proposals for this project are to be sent to gpiestimating@garney.com no later than October 5th, 2020 @ 12:00pm.
PROJECT DESCRIPTION:
The Conveyance Infrastructure Project will consist of the construction of conveyance infrastructure for Source Water, ROC, and Purified Water. The Source Water Pipeline will convey tertiary treated effluent from the Santa Cruz WWTF to the Chanticleer AWPF site; The ROC pipeline will convey the ROC and any reject or excess water to the Santa Cruz TTF along the same alignment of the tertiary treated effluent pipeline where it will terminate at a connection to the outfall; and The Purified Water Pipeline will convey purified water from the AWPF to the SWIP injection wells. The Engineers Estimate is $30,000,000.00 - $40,000,000.00.

Program Funding
Components of this Program may be funded, in whole or in part, by various sources, including, but not limited to
• The Proposition 1 Groundwater Grant Program administered by the California State Water Resources Control Board (State Water Board)
• The Clean Water State Revolving Fund (CWSRF) program (partnership between State of California and US Environmental Protection Agency) low-cost financing
• The Water Infrastructure Finance and Innovation Act (WIFIA) program, and
• The Bureau of Reclamation's Title XVI program.
Additional requirements may be applicable to this contract based on the funding sources acquired, ie. the use of American Iron and Steel is required by these entities.
Please note that Garney Pacific Inc. is signatory to the Laborers and Operators Unions
We intend to help and work with all qualified firms seeking participation on this project. Feel free to call our office with any questions you may have. Portions of work for the project include the following: SWPPP*AC Paving/PCC Replacement*Type 2 Slurry Seal/Mico Surfacing*Traffic Control*Trucking*Aggregates*Shoring*Concrete Curb/Gutter and Sidewalk Replacement*Rebar/Welded Wire Mesh*Concrete Supply*Structural/Misc. Metals(including bridge hangers and hardware)*Architectural Cover*Painting/Coating*Signage*Traffic Loops*Dewatering*Pipe Supports*Saw cutting*Anchor Drilling*Pipe Supply*Valve Supply*Fencing*Striping, etc.
Garney subcontract is available for review upon request.
Outreach Terms & Requirements-To view or obtain plans, specs, and project document, FIRMS should contact the CONTRACTOR to get required project resource. -The CONTRACTOR will provide FIRMS, if requested, with required assistance in bonding, insurance.
-Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation.
-Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration.
- The project is a prevailing wage public job. The FIRM's quote must consider all terms related to prevailing wages terms.
- FIRMS must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project
-100% payment bond and performance bond for the full amount of the subcontract price may be required.
-FIRMS that submit their quote explicitly acknowledge and agree to all above terms and responsibilities.
- We arean equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, suppliers
-The firm must beregistered with Department of Industrial Relation and should have a current DIR number.



How to get in touch


Outreach Coordinator
gpiestimating@garney.com

Project Estimator
Matt Roberts

Telephone
(925) 800-1848

Fax
(000) 000-0000

Address
324 E 11th St, Suite E2
Tracy, CA 95376