DBEGoodFaith.com


Shimmick Construction Company, Inc.

Is seeking qualified DBEs, MBEs, WBEs, DVBEs, SBEs



Outreach Coordinator
Trina Clay

Project Estimator
Brian Larsen

Telephone
(949) 333-1517

Fax
(949) 333-1510

Address
530 Technology Drive, Suite 300
Irvine, CA 92618


Project Name
North City PURE Water Facility

Bid/Contract #
K-21-1810-DBB-3-A

Awarding Agency
City of San Diego

Project Location
San Diego, San Deigo County, CA

Bid Date
10/13/2020 at 14:00

Project Details
Shimmick Construction Company, Inc. is a Prime Contractor requesting bids from certified SBE/MBE/WBE/DBE firms. Subcontractors/Suppliers/Professional Service for the following project:
City of San Diego, Department of Public Works
North City PURE Water Facility BID No. K-21-1810-DBB-3-A
Bid Date & Time: OCTOBER 13, 2020 @ 2:00PM *Please submit bids/scope-letters by: October 9, 2020*
FORM 4500-3 must be completed & submitted with your bid/scope letters

ALL Subcontractors with package values greater than 1/2% of the total project value must submit a completed "OCIP Worksheet" to Shimmick COB October 9, 2020

PROJECT OVERVIEW: The NCPWF will be constructed north of Eastgate Mall across from the existing NCWRP. The completed facility will provide the owner with a production capacity of 34 million gallons per day of purified water that will be conveyed to Miramar Reservoir for augmentation. The NCPWF includes, but is not limited to, Operation and Maintenance Building, process facilities including ozone, biological active carbon (BAC) filters, membrane filtration (MF), including Pre-Selected System per Supplemental Volume A of Technical Specifications, reverse osmosis (RO), ultraviolet (UV) advanced oxidation, including Pre-Selected System per Supplemental Volume B of Technical Specification, support systems including chemicals, HVAC, electrical, instrumentation & control, and site work, all in accordance with the special provisions, drawings, and technical specification. The Project has specific milestones, constraints, testing periods, and completion requirements.

Scopes of work requested but not limited to the following:

SUBCONTRACTORS: AC Paving, Rebar, AC Dike, Flatwork, PCC Pavement, Fencing & Gates, CIDH Pile, Demolition, Core & Sawcutting, Asphalt Coldplane & Milling, Striping, Traffic Control, Landscaping & Irrigation (Hydroseeding), Pavers, Joint Seal, Excavation & Grading, Shoring, Signs, Roofing, Canopy, Ceiling & Acoustical Ceiling Panel, Painting & Coating, QA/QC, Anti-Graffiti Coating, Drywall, Flooring, Plumbing, Doors, Windows, Pipe Insulation, Certified Welding Inspection, Welding, HVAC, Structural Steel, Misc. Metals, Cabinetry, Waterproofing, Sheet Metal/Metal Roof, Skylights, Concrete Pumping, Fire Alarm, Sweepers, Water Trucks, Super-10's, End Dumps and Bottom Dumps.

SUPPLIERS: Aggregate, Ready Mix, Formliner, Misc. Precast Concrete Items (curb stops, trash receptacle, bench, etc.) Geotextile/Liner, Traffic Control items, Structural Soil/Bio-Engineered Soil, Roadway Signs, Architectural/Wayfinding Signs, Windows, Doors, Roof Access Hatch, Restroom (toilet, sinks, showers), FRP/Structural Composites, Pipe Supports, Welded Steel Pipe, Stainless Steel Pipe, Valves & Pumps & Process Equipment (various types & sizes), HDPE Pipe, Ductile Iron Pipe, Catholic Protection, Site Furnishings (Lockers, Benches, Bike Racks, Lab Fume Hood, Fountain, etc.), Louvers, Lighting, Electrical Hardware & Power Distribution, Grounding Materials

Shimmick Construction has listed scopes of work that can be broken down into economically feasible packages to encourage participation. Shimmick will conduct ourselves in good faith with all firms participating on this project. The Owner has implemented an OCIP, Owner Controlled Insurance Program for this project, as detailed in Section 7-4, Contractor and subcontractors still provide some insurance coverage under the OCIP.

This project is subject to a Project Labor Agreement (PLA)

Shimmick Construction Company, Inc. - 530 Technology Drive, Suite 300 - Irvine, CA 92618
Phone: (949) 333-1500, Fax: (949) 333-1510
For additional project information or to discuss obtaining necessary equipment, supplies, and/or materials, please contact Brian Larsen at blarsen@shimmick.com or 949-398-6019. Send all quotes for this project to estimating.southwest@shimmick.com.

Contract documents are available: Contract Documents may be obtained by visiting the City's website: https://www.sandiego.gov/cip/bidopps. Plans and Specifications for this contract are available for review in the office of the City Clerk or Public Works Contracts, City of San Diego. Shimmick Construction has made the plans and specifications available through SmartBidNet: https://securecc.smartinsight.co/#/PublicBidProject/534434 if you require assistance with access to plans/specs or contract requirements please contact Trina Clay at tclay@shimmick.com or at 949-333-1517.

CONTRACTOR REGISTRATION REQUIREMENTS: Labor Code Section 1771.1 (a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.

Bids submitted will confirm the acceptance of the terms and conditions of SCCI's Standard Long Form Subcontract or Purchase Order, available upon request. A Subcontractor/Supplier providing a proposed bid/price will be viewed as accepting SCCI's Standard Long Form Subcontract or Purchase Order-100% Performance and Payment bonds are required for subcontractors, material bonds are required from all suppliers. Shimmick Construction will pay bond premium up to 2%. Subcontractors/Suppliers will be required to abide by terms and conditions of the AGC Master Labor Agreements. All proposers are bound to the prime contract terms and conditions, including payment provisions. Insurance coverage is required as set by the Prime Contract or Shimmick Construction - whichever is greatest. Minimum insurance requirements: General Liability $1M-Per Occurrence/$2M-Agg/$2M-Completed Operations; Excess Liability $5M; Auto Liability $1M; Workers Comp & Employer Liability $1M. The listing of a Subcontractor/Supplier is not to be construed as an acceptance of all of the conditions or exceptions included with the price quote. Shimmick requires that Subcontractor & Supplier price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. For assistance with bonding, insurance or lines of credit contact Trina Clay at tclay@shimmick.com or 949-333-1517.

Shimmick Construction Company, Inc. is An Equal Opportunity Employer

How to get in touch


Outreach Coordinator
Trina Clay

Project Estimator
Brian Larsen

Telephone
(949) 333-1517

Fax
(949) 333-1510

Address
530 Technology Drive, Suite 300
Irvine, CA 92618