The project is located on Silverado Trail at Taplin Road and Silverado Trail Bridge at MPM 26.50 in Napa County, CA. Contractor shall possess a Class A license at the time of contract award. The proposed work will consist of pressure grouting exposed cracks in the stone barrier. The DBE goal for this project is 6%.
The Davis Bacon Act and related provisions apply. Plans and Specifications are available at the following link: https://www.countyofnapa.org/2960/Silverado-Trail-Bridge-RepairsRDS-18-25-