DBEGoodFaith.com


Thompson Builders Corporation

Is seeking qualified SBEs



Outreach Coordinator
Shannon Miller

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949


Project Name
Castro Mission Health Center

Bid/Contract #
Sourcing Event ID 0000002173 / Contract No. 1000012290

Awarding Agency
City & County of San Francisco, Department of Public Works

Project Location
San Francisco, San Francisco County, CA

Bid Date
07/22/2020 at 02:30

Project Details
ALL POTENTIAL SBE SUBCONTRACTORS
*********************************************************************************
THOMPSON BUILDERS CORPORATION is requesting bids from ALL subcontractors, suppliers & truckers, but ESPECIALLY DBE subcontractors, suppliers & truckers for the following project:

Castro Mission Health Center
Owner: City & Co. of San Francisco

Bid Date: 7/22/2020 @ 2:30 PM Estimate: over $8,000,000

Seeking ALL subcontractors/suppliers/truckers, but ESPECIALLY SBE SUBCONTRACTORS, SUPPLIERS AND TRUCKERS for this project, TRADES NEEDED (but not limited to):

DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
APPENDIX A: TEMPORARY STREET CLOSURES
01 20 00 PRICE AND PAYMENT PROCEDURES
01 21 00 ALLOWANCES
01 21 50 MOBILIZATION ITEM
01 25 13 PRODUCT SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 29 73 SCHEDULE OF VALUES
01 30 00 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES




01 31 13 PROJECT COORDINATION
01 31 19 PROJECT MEETINGS
01 31 33 PARTNERING PROCEDURES
01 31 34 APPENDIX A: THREE-PARTY FACILITATOR AGREEMENT
01 32 16 CONSTRUCTION PROGRESS SCHEDULE (CPM)
01 32 33 PHOTOGRAPHIC DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 35 44 HAZARDOUS BUILDING MATERIALS SCOPE OF WORK
01 35 45 HEALTH AND SAFETY CRITERIA
APPENDIX A: BEST PRACTICE COVID-19 CONSTRUCTION FIELD SAFETY
GUIDELINES, APRIL 1, 2020
01 35 49 MINIMUM ENVIRONMENTAL PROCEDURES
APPENDIX A: ALERT SHEET AFFIDAVIT
APPENDIX B: ALERT SHEET & CULTURAL BRIEFING
APPENDIX C: ALERT SHEET & CULTURAL BRIEFING SPANISH
01 35 50 ADDITIONAL ENVIRONMENTAL PROCEDURES
01 41 00 REGULATORY REQUIREMENTS
01 42 00 REFERENCES
01 45 00 QUALITY CONTROL
01 50 00 TEMPORARY FACILITIES AND CONTROLS
APPENDIX A: PROJECT SIGN
APPENDIX B: TOW-AWAY SIGN ACTIVATION AND PHOTO UPLOAD PROCESS
01 52 13 FIELD OFFICES AND SHEDS
01 56 39 TEMPORARY TREE AND PLANT PROTECTION
01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL
01 57 26 TEMPORARY PROTECTION OF CATCH BASIN AND STORM DRAIN INLETS
01 60 00 PRODUCT REQUIREMENTS
01 71 23 FIELD ENGINEERING
01 71 33 PROTECTION OF ADJACENT CONSTRUCTION
01 73 29 CUTTING AND PATCHING
01 74 50 CONSTRUCTION & DEMOLITION DEBRIS RECOVERY PLAN
01 74 51 APPENDIX A: C&D DEBRIS RECOVERY WORKSHEET
01 77 00 CLOSEOUT PROCEDURES
01 77 13 APPENDIX A: WAIVER AND RELEASE OF CLAIMS ON FINAL PAYMENT
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 36 WARRANTIES
01 78 39 PROJECT RECORD DOCUMENTS
FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 EXISTING CONDITIONS
02 41 19 SELECTIVE DEMOLITION
02 80 13 HAZARDOUS BUILDING MATERIALS REMEDIATION
02 81 00 ENVIRONMENTAL MANAGEMENT OF EXCAVATED MATERIALS
DIVISION 03 CONCRETE
03 10 00 CONCRETE FORMING AND ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 37 13 SHOTCRETE
03 80 00 DRILLING, SAWCUTTING AND REMOVAL OF MASONRY AND CONCRETE
03 90 00 POST-INSTALLED ANCHORING SYSTEMS
DIVISION 5 METALS
05 12 00 STRUCTURAL STEEL FRAMING
05 51 00 METAL STAIRS
05 52 00 HANDRAILS AND RAILINGS
DIVISION 6 WOOD AND PLASTICS
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 00 CUSTOM CASEWORK



06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 7 THERMAL AND MOISTURE PROTECTION
07 19 00 WATER REPELLENT COATING
07 20 00 BUILDING INSULATION
07 26 16 BELOW GRADE VAPOR RETARDERS
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING AND SMOKESEALS
07 92 00 JOINT SEALANTS
DIVISION 8 DOORS AND WINDOWS
08 10 00 STEEL DOOR FRAMES
08 14 00 WOOD DOORS
08 31 13 ACCESS DOORS AND FRAMES
08 36 16 BARN (SLIDING) DOOR
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 71 00 FINISH HARDWARE
08 80 00 GLAZING
DIVISION 9 FINISHES
09 10 00 METAL SUPPORT SYSTEMS
09 24 00 PORTLAND CEMENT PLASTERING
09 29 00 GYPSUM WALLBOARD
09 30 00 TILING
09 51 00 ACOUSTICAL CEILINGS
09 61 20 CONCRETE SEALER
09 65 00 RESILIENT FLOORING
09 90 10 LANDSCAPE PAINTING
09 91 00 PAINTING
09 91 23 DRY ERASE COATING
DIVISION 10 SPECIALTIES
10 21 54 CUBICLE TRACK AND HARDWARE
10 26 00 WALL AND CORNER GUARDS
10 28 00 TOILET AND BATH ACCESSORIES
10 28 13.19 HEALTHCARE ACCESSORIES
10 44 13 FIRE EXTINGUISHER CABINET
10 51 26 PLASTIC LOCKERS
DIVISION 12 FURNISHINGS
12 24 00 WINDOW SHADES
12 93 00 SITE FURNISHINGS
DIVISION 21 FIRE SUPPRESSION
21 00 00 FIRE PROTECTION
DIVISION 22 PLUMBING
22 05 00 COMMON WORK RESULTS FOR PLUMBING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING
22 05 53 IDENTIFICATIONS FOR PLUMBING
22 07 00 PLUMBING INSULATION
22 11 00 DOMESTIC WATER SYSTEMS
22 13 00 SANITARY SOIL WASTE AND VENT SYSTEM
22 16 00 NATURAL GAS SYSTEM
22 40 00 PLUMBING FIXTURES
DIVISION 23 HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)
23 05 00 COMMON WORK RESULTS FOR HVAC
23 05 13 COMMON WORK REQUIREMENTS FOR HVAC EQUIPMENT
23 05 19 METERS AND GAUGES FOR HVAC
23 05 23 GENERAL DUTY VALVES FOR HVAC PIPING
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 48 VIBRATIONS AND SEISMIC CONTROLS FOR HVAC
23 05 53 IDENTIFICATIONS FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 13 HVAC INSULATION
23 21 13 HYDRONIC PIPING
23 25 00 HVAC WATER TREATMENT
23 31 00 HVAC DUCTS AND CASINGS
23 33 00 AIR DUCT ACCESSORIES
23 34 00 HVAC FANS
23 36 00 AIR TERMINAL UNITS
23 37 00 AIR OUTLETS AND INLETS
23 40 00 HVAC AIR CLEANING DEVICES
23 62 13 AIR COOLED WATER CHILLER
23 73 00 INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23 82 16 AIR COILS
DIVISION 26 ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 11 REQUIREMENTS FOR ELECTRICAL INSTALLATION
26 05 23 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORT FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 51 00 INTERIOR LIGHTING
DIVISION 27 COMMUNICATIONS
27 52 23 NOT USED
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
28 31 00 FIRE DETECTION AND ALARM
DIVISION 31 EARTHWORK
31 10 00 SITE CLEARING
31 13 00 SELECTIVE TREE AND SHRUB REMOVAL AND PRUNING
31 22 13 GRADING OPERATIONS
31 23 16 STRUCTURAL EXCAVATION / EARTHWORK
31 23 23 STRUCTURAL FILL
31 40 00 BRACING, SHORING, AND UNDERPINNING
DIVISION 32 EXTERIOR IMPROVEMENTS
32 01 90 LANDSCAPE MAINTENANCE
32 31 19 FABRICATED METALS
32 33 00 LANDSCAPE CONCRETE
32 35 00 LANDSCAPE CONCRETE FINISHING
32 80 00 LANDSCAPE IRRIGATION DESIGN BUILD
32 90 00 PLANTING
32 91 19 PLANTING PREPARATION
DIVISION 44 POLLUTION AND WASTE CONTROL EQUIPMENT
44 21 13 FIXED NOISE ABATEMENT BARRIERS

Please submit bids to us by noon on bid day.

Plans and specs may be viewed and downloaded for free here:
https://tpcorp.box.com/s/7wewu9uhytow5qwvpwjcpiyhiwbi9hke

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

How to get in touch


Outreach Coordinator
Shannon Miller

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949