DBEGoodFaith.com


Mercer-Fraser Company

Is seeking qualified DBEs



Outreach Coordinator
Cassie Coppini

Project Estimator
Mark Benzinger

Telephone
(707) 443-6371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502


Project Name
INSTALL POTABLE, NON-POTABLE WATER & WASTEWATER IMPROVEMENT

Bid/Contract #
02-4G5804

Awarding Agency
CALTRANS

Project Location
SHASTA LAKE CITY, SHASTA County, CA

Bid Date
05/29/2020 at 02:00

Project Details
LEAD COMPLIANCE PLAN
CONSTRUCTION AREA SIGNS
TRAFFIC CONTROL SYSTEM
TYPE III BARRICADE
CHANNELIZER (SURFACE MOUNTED)
PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS
PORTABLE CHANGEABLE MESSAGE SIGN (EA)
TEMPORARY RAILING (TYPE K)
ALTERNATIVE TEMPORARY CRASH CUSHION
JOB SITE MANAGEMENT
PREPARE WATER POLLUTION CONTROL PROGRAM
TEMPORARY DRAINAGE INLET PROTECTION
TEMPORARY FIBER ROLL
TEMPORARY CONCRETE WASHOUT
WATER QUALITY MONITORING REPORT
TEMPORARY CREEK DIVERSION SYSTEMS
TREATED WOOD WASTE
INVASIVE SPECIES CONTROL
CLEARING AND GRUBBING (LS)
SOIL AMENDMENT
PACKET FERTILIZER
SLOW-RELEASE FERTILIZER
PLANT (GROUP A)
MAINTAIN EXISTING PLANTED AREAS
PLANT ESTABLISHMENT WORK
DECOMPOSED GRANITE
WOOD MULCH
CHECK AND TEST EXISTING IRRIGATION FACILITIES
REMOVE IRRIGATION FACILITY
RISER SPRINKLER ASSEMBLY
POP-UP SPRINKLER ASSEMBLY
1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)
3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)
1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)
DRY SEED (SQFT)
REMOVE RETAINING WALL (LS)
BRIDGE REMOVAL
DESTROY WELL
CHAIN LINK FENCE (TYPE CL-6, SLATTED)
12' CHAIN LINK GATE (TYPE CL-6, SLATTED)
REMOVE CHAIN LINK FENCE
REMOVE PET AREA SIGN
CONCRETE BARRIER (TYPE 50)
REMOVE CONCRETE BARRIER
BUILDING WORK

Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

How to get in touch


Outreach Coordinator
Cassie Coppini

Project Estimator
Mark Benzinger

Telephone
(707) 443-6371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502