DBEGoodFaith.com


James W. Fowler Co.

Is seeking qualified DBEs, MBEs, WBEs, ESB



Outreach Coordinator
Sonja Sommerfeldt

Project Estimator
Jim Jackson

Telephone
(503) 623-5373

Fax
(503) 623-9117

Address
12775 Westview Drive
Dallas, OR 97338


Project Name
Road 10 MP 6.2 to 8.2 Improvements Project

Bid/Contract #
Bid Number 00001451

Awarding Agency
City of Portland

Project Location
Portland , Multnomah County, OR

Bid Date
04/30/2020 at 02:00

Project Details
The W02110.DC project involves the construction of street improvements along the following street:

Road 10E MP 6.2-8.2

The Contractor shall perform all labor, and furnish all materials, equipment and incidentals required by the Contract Documents to make each item complete. Work includes, but is not limited to:
Construct, maintain, and remove temporary work zone traffic control measures.
Construct, maintain, and remove erosion control measures.
Construct drainage system including culverts.
Construct light weight fill walls.
Construct retaining walls.
Construct roadway improvements including Aggregate base, HMAC and wearing surfaces.
Perform right-of-way development including seeding.

Subcontractor and supplier opportunities are available but not limited to the following categories of work: quality control testing subcontractor; flagging/traffic control subcontractor; surveying subcontractor; demolition subcontractor; site clean up subcontractor; contaminated soil remediation subcontracting; concrete supplier; cast-in-place subcontractor; concrete boring subcontractor; saw cutting subcontractor; signage subcontractor; fill & backfill subcontractor; excavation subcontractor; erosion control subcontractor; asphalt paving subcontractor; paving stone unit paving subcontractor; aggregate supplier; curbs, gutters and sidewalks subcontractor; pavement marking/striping subcontractor; fencing subcontractor; irrigation subcontractor; landscaping subcontractor; underground utilities subcontractor; trucking (dump trucks) subcontractor; dechlorination/chlorination subcontractor; and shoring subcontractor.

D/M/W/ESB Aspirational Goal: 20% (up to 5% for suppliers)

D/M/WBE Utilization Goal: 14%

James W. Fowler Co. is an equal opportunity employer and we are requesting qualified subcontractor and supplier bids from all interested firms, including disadvantaged, minority, women, and other business enterprises. Where economically feasible, we are willing to divide total contract requirements into smaller portions or quantities to permit maximum participation by D/M/W/ESB firms. Please contact us to discuss opportunities available.

James W. Fowler Co. will assist D/M/W/ESB subcontractors in obtaining necessary equipment, supplies, or materials. We are also available to provide assistance in obtaining bonding, lines of credit and/or insurance to D/M/W/ESB subcontractors. Please complete all negotiations 24-hours prior to bid opening. We also encourage the utilization of apprentices for this project.

Bid documents can be obtained from the City of Portland or from James W. Fowler Co. by clicking on the link below. The plans and specs are available at no cost on the James W. Fowler Co. website at www.jwfowler.com. For more information, please contact James W. Fowler Co. at (503) 623-5373. Quotes may be faxed to (503) 623-9117 or emailed to estimating@jwfowler.com.

Please follow the below link for specifications, plans and addenda issued for this project:

http://www.jwfowler.com/bidopportunities/

How to get in touch


Outreach Coordinator
Sonja Sommerfeldt

Project Estimator
Jim Jackson

Telephone
(503) 623-5373

Fax
(503) 623-9117

Address
12775 Westview Drive
Dallas, OR 97338