Is seeking qualified DBEs
Outreach Coordinator
Cassie Coppini
Project Estimator
Mark Benzinger
Telephone
(707) 443-6371
Fax
(707) 443-0277
Address
P.O. Box 1006
Eureka, CA 95502
Project Name
Construct Structural Concrete Soldier Wall & Drill Hole for Pile
Bid/Contract #
01-0F0804
Awarding Agency
Caltrans
Project Location
Weitchpec, Humboldt County, CA
Bid Date
04/01/2020 at 02:00
Project Details
LEAD COMPLIANCE PLAN
CONSTRUCTION AREA SIGNS
TRAFFIC CONTROL SYSTEM
PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS
PORTABLE CHANGEABLE MESSAGE SIGN (EA)
JOB SITE MANAGEMENT
PREPARE WATER POLLUTION CONTROL PROGRAM
MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)
TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX)
TEMPORARY COVER
TEMPORARY FIBER ROLL
TEMPORARY REINFORCED SILT FENCE
STREET SWEEPING
TEMPORARY CONCRETE WASHOUT
CONTRACTOR-SUPPLIED BIOLOGIST (DAY)
CLEARING AND GRUBBING (LS)
ROADWAY EXCAVATION
SHOULDER BACKING
STRUCTURE EXCAVATION (SOLDIER PILE WALL)
STRUCTURE BACKFILL (SOLDIER PILE WALL)
CONCRETE BACKFILL (SOLDIER PILE WALL)
LEAN CONCRETE BACKFILL
WOOD MULCH
MOVE-IN/MOVE-OUT (EROSION CONTROL)
HYDROMULCH
FIBER ROLLS
HYDROSEED
STEEL SOLDIER PILE (W 14 X 145)
30" DRILLED HOLE
STRUCTURAL CONCRETE, SOLDIER WALL
CONCRETE SURFACE TEXTURE (FOREST MOTIF)
BAR REINFORCING STEEL (RETAINING WALL)
TIMBER LAGGING
CLEAN AND PAINT STEEL SOLDIER PILING
PREPARE AND STAIN CONCRETE
PEDESTRIAN RAILING
6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY)
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
How to get in touch
Outreach Coordinator
Cassie Coppini
Project Estimator
Mark Benzinger
Telephone
(707) 443-6371
Fax
(707) 443-0277
Address
P.O. Box 1006
Eureka, CA 95502