Project Name
Washoe County South Truckee Meadows Water Reclamation 2020 Facility Expansion Project

Bid/Contract #
S-01 Earthwork

Awarding Agency
MWH Constructors and KG Walters Construction a Partnership

Project Location
Reno, Washoe County, NV

Bid Date
03/31/2020 at 14:00

Project Details
Advertisement and Request for Prequalified Subcontractor Bids for the
Washoe County South Truckee Meadows Water Reclamation 2020 Facility Expansion Project

MWH Constructors / KG Walters has been selected for the Washoe County South Truckee Meadows Water Reclamation 2020 Facility Expansion Project, HUFFAKER HILLS RESERVOIR LINING IMPROVEMENT PROJECT, GMP #1 located in Reno, NV.

Each Subcontractor must be qualified to bid pursuant to NRS chapter 338.16991. Submit a prequalification package on MWH Constructors / KG Walters Construction forms no later than 5:00 PM, March 19, 2020. For Prequalification follow the instructions below:

Prequalification applications can be obtained by emailing Matt Morin at matthew.morin@mwhconstructors.com or 207-890-0343

E-mail prequalification package to matthew.morin@mwhconstructors.com no later than 5:00 PM, March 19, 2020.

For assistance or questions regarding this prequalification contact Matt Morin at 207-890-0343 or matthew.morin@mwhconstructors.com

Scope of Work: S-01 Earthwork
Bid Date: March 31, 2020
Bid Time: 2:00 PM
Bid Submittal: Sealed Bids will be received at:
Attn: MWH / KGW
Community Services Conference Room
Administration Building A
1001 East Ninth Street
Reno, NV 89506

Mandatory Pre-bid and Site Visit for Earthwork:
Date: March 13, 2020
Location: Paisan’s Deli and Catering
6550 Longley Ln, Ste 110
Reno, NV 89511
Time: 9:00 a.m.
Prebid will start at Paisan’s and then a site visit will follow
Total estimated project value: $6,000,000
Trades required for project: Earthwork

Scope: Site clearing, excavation and disposal of material, import material, backfill subgrade and place liner bedding in preparation for reservoir liner installation.

This project is being funded through the Clean Water State Revolving Fund Program (SRF). MWH / KGW is requesting subcontractors and supplier quotes from all qualified/certified DBE subcontractors and suppliers. In accordance with Executive Order 12549, contractors, subcontractors, and material and service suppliers (including engineers) who’s contract is expected to equal or exceed $25,000 must have a DUNS number and be registered in the US Government System for Award Management (SAM). SRF requires the implementation of the American Iron and Steel Act. Your participation is important to us. If we can be of help to you or answer any question or concerns you might have, please contact 207-890-0343.

Apprentices-NRS 338.01165; SB 207 (2019)

As of January 1, 2020, NRS 338.01165 requires all contractors employing workers on certain public works projects to utilize apprentices for portions of the work. One or more apprentices must be used for at least 10% of the total hours on vertical construction and 3% of the total hours for horizontal construction. These percentages apply to the total hours of labor worked for each apprenticed craft or type of work to be performed on the public work for which more than three workers are employed. Under NRS Chapter 338, this project is a public work that requires the use of apprentices. All contractors must comply with NRS 338.01165 for this project, unless a modification, waiver, or exemption applies.

The Nevada Labor Commissioner has prepared forms for use in complying with the apprenticeship requirements. The following forms are available on the Labor Commissioner’s website at: http://labor.nv.gov/Apprenticeship_Utilization_Act/Apprenticeship_Utilization_Act/
• Apprenticeship Utilization Request Form
Titled “Request For Apprentice Availability On A Public Work”

• Apprenticeship Utilization Waiver Request Form
Titled: “Apprenticeship Utilization Act Waiver Request”

• Apprenticeship Agreement Form
Titled: “Apprentice Agreement”
• *Sample* Project Workforce Checklist
Titled: “Project Workforce Checklist”
NO APPRENTICESHIP DOCUMENTS ARE REQUIRED TO BE SUBMITTED WITH A CONTRACTOR’S BID.
After the bids are opened, the apparent successful bidder must provide the Project Workforce Checklist to MWH / KGW within 24 hours after bid opening along with the subcontractor list. A PROJECT WORKFORCE CHECKLIST MUST BE COMPLETED BY THE CONTRACTOR AND BY EACH SUBCONTRACTOR.
If apprentices are required by NRS 338.01165, within 2 business days after bid opening the apparent successful bidder and each subcontractor must submit the Apprenticeship Utilization Request Form to any necessary Registered Apprenticeship Programs to request apprentices for the project, and must provide proof of submission to MWH / KGW. Within the 8 business days after bid opening, the apparent successful bidder and all subcontractors must provide to MWH / KGW the responses, or non-responses, from the Registered Apprenticeship Programs, along with any requests for waivers of the apprenticeship requirements on the “Apprenticeship Utilization Waiver Request Form.”
Waiver requests may be submitted to MWH / KGW at any time, but waiver requests due to NRS 338.01165(10)(d)(1) (no apprentices available from apprenticeship programs within Washoe County’s jurisdiction) and (3) (apprentices requested from an apprenticeship program have been denied or not approved within 5 business days) must be submitted to MWH / KGW at least within 8 business days after bid opening. Other waiver requests should be submitted to MWH / KGW as soon as the need for a waiver is known. Along with the waiver request, the apparent successful bidder and any subcontractors must provide to MWH / KGW all required documentation to support the waiver request.
MWH / KGW will work with bidders and subcontractors to comply with NRS 338.01165. MWH / KGW reserves the right to waive these deadlines if problems in the NRS 338.01165 apprenticeship process arise.
IF NO WAIVER OR MODIFICATION IS OBTAINED, THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH THE APPRENTICESHIP REQUIREMENTS OF NRS 338.01165.
Bid Docs may be obtained from Sierra Contractors Source at www.sdsplanroom.com or 775-329-7222. Bid Docs will be posted on iSqFt to all prequalified subcontractors March 2, 2020 by 12:00 p.m.

NOTICE: Subcontractors, who will perform at least 1% of the estimated value of the work or $50,000 -whichever is greater- must be qualified pursuant to NRS 338.16991. Proposals will be returned to the subcontractor unopened if the subcontractor has not been qualified per NAC 338.580. The submission of a materially incomplete or falsified application for qualification by an applicant or failure to disclose information required in the application may be grounds for disqualification.

Advertisement and Request for Prequalified Subcontractor Bids for the
Washoe County South Truckee Meadows Water Reclamation 2020 Facility Expansion Project

MWH Constructors / KG Walters has been selected for the Washoe County South Truckee Meadows Water Reclamation 2020 Facility Expansion Project, HUFFAKER HILLS RESERVOIR LINING IMPROVEMENT PROJECT, GMP #1 located in Reno, NV.

Each Subcontractor must be qualified to bid pursuant to NRS chapter 338.16991. Submit a prequalification package on MWH Constructors / KG Walters Construction forms no later than 5:00 PM, March 19, 2020. For Prequalification follow the instructions below:

Prequalification applications can be obtained by emailing Matt Morin at matthew.morin@mwhconstructors.com or 207-890-0343

E-mail prequalification package to matthew.morin@mwhconstructors.com no later than 5:00 PM, March 19, 2020.

For assistance or questions regarding this prequalification contact Matt Morin at 207-890-0343 or matthew.morin@mwhconstructors.com

Scope of Work: S-01 Earthwork
Bid Date: March 31, 2020
Bid Time: 2:00 PM
Bid Submittal: Sealed Bids will be received at:
Attn: MWH / KGW
Community Services Conference Room
Administration Building A
1001 East Ninth Street
Reno, NV 89506

Mandatory Pre-bid and Site Visit for Earthwork:
Date: March 13, 2020
Location: Paisan’s Deli and Catering
6550 Longley Ln, Ste 110
Reno, NV 89511
Time: 9:00 a.m.
Prebid will start at Paisan’s and then a site visit will follow
Total estimated project value: $6,000,000
Trades required for project: Earthwork

Scope: Site clearing, excavation and disposal of material, import material, backfill subgrade and place liner bedding in preparation for reservoir liner installation.

This project is being funded through the Clean Water State Revolving Fund Program (SRF). MWH / KGW is requesting subcontractors and supplier quotes from all qualified/certified DBE subcontractors and suppliers. In accordance with Executive Order 12549, contractors, subcontractors, and material and service suppliers (including engineers) who’s contract is expected to equal or exceed $25,000 must have a DUNS number and be registered in the US Government System for Award Management (SAM). SRF requires the implementation of the American Iron and Steel Act. Your participation is important to us. If we can be of help to you or answer any question or concerns you might have, please contact 207-890-0343.

Apprentices-NRS 338.01165; SB 207 (2019)

As of January 1, 2020, NRS 338.01165 requires all contractors employing workers on certain public works projects to utilize apprentices for portions of the work. One or more apprentices must be used for at least 10% of the total hours on vertical construction and 3% of the total hours for horizontal construction. These percentages apply to the total hours of labor worked for each apprenticed craft or type of work to be performed on the public work for which more than three workers are employed. Under NRS Chapter 338, this project is a public work that requires the use of apprentices. All contractors must comply with NRS 338.01165 for this project, unless a modification, waiver, or exemption applies.

The Nevada Labor Commissioner has prepared forms for use in complying with the apprenticeship requirements. The following forms are available on the Labor Commissioner’s website at: http://labor.nv.gov/Apprenticeship_Utilization_Act/Apprenticeship_Utilization_Act/
• Apprenticeship Utilization Request Form
Titled “Request For Apprentice Availability On A Public Work”

• Apprenticeship Utilization Waiver Request Form
Titled: “Apprenticeship Utilization Act Waiver Request”

• Apprenticeship Agreement Form
Titled: “Apprentice Agreement”
• *Sample* Project Workforce Checklist
Titled: “Project Workforce Checklist”
NO APPRENTICESHIP DOCUMENTS ARE REQUIRED TO BE SUBMITTED WITH A CONTRACTOR’S BID.
After the bids are opened, the apparent successful bidder must provide the Project Workforce Checklist to MWH / KGW within 24 hours after bid opening along with the subcontractor list. A PROJECT WORKFORCE CHECKLIST MUST BE COMPLETED BY THE CONTRACTOR AND BY EACH SUBCONTRACTOR.
If apprentices are required by NRS 338.01165, within 2 business days after bid opening the apparent successful bidder and each subcontractor must submit the Apprenticeship Utilization Request Form to any necessary Registered Apprenticeship Programs to request apprentices for the project, and must provide proof of submission to MWH / KGW. Within the 8 business days after bid opening, the apparent successful bidder and all subcontractors must provide to MWH / KGW the responses, or non-responses, from the Registered Apprenticeship Programs, along with any requests for waivers of the apprenticeship requirements on the “Apprenticeship Utilization Waiver Request Form.”
Waiver requests may be submitted to MWH / KGW at any time, but waiver requests due to NRS 338.01165(10)(d)(1) (no apprentices available from apprenticeship programs within Washoe County’s jurisdiction) and (3) (apprentices requested from an apprenticeship program have been denied or not approved within 5 business days) must be submitted to MWH / KGW at least within 8 business days after bid opening. Other waiver requests should be submitted to MWH / KGW as soon as the need for a waiver is known. Along with the waiver request, the apparent successful bidder and any subcontractors must provide to MWH / KGW all required documentation to support the waiver request.
MWH / KGW will work with bidders and subcontractors to comply with NRS 338.01165. MWH / KGW reserves the right to waive these deadlines if problems in the NRS 338.01165 apprenticeship process arise.
IF NO WAIVER OR MODIFICATION IS OBTAINED, THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH THE APPRENTICESHIP REQUIREMENTS OF NRS 338.01165.
Bid Docs may be obtained from Sierra Contractors Source at www.sdsplanroom.com or 775-329-7222. Bid Docs will be posted on iSqFt to all prequalified subcontractors March 2, 2020 by 12:00 p.m.

NOTICE: Subcontractors, who will perform at least 1% of the estimated value of the work or $50,000 -whichever is greater- must be qualified pursuant to NRS 338.16991. Proposals will be returned to the subcontractor unopened if the subcontractor has not been qualified per NAC 338.580. The submission of a materially incomplete or falsified application for qualification by an applicant or failure to disclose information required in the application may be grounds for disqualification.

How to get in touch


Outreach Coordinator
Stephanie Cummins

Project Estimator
John Swain

Telephone
(720) 547-5364

Fax
(720) 815-3912

Address
370 Interlocken Blvd, Ste 400
Broomfield, CO 80021