DBEGoodFaith.com


Mercer-Fraser Company

Is seeking qualified DBEs, MBEs, WBEs, SBEs



Outreach Coordinator
Cassie Coppini

Project Estimator
Mark Benzinger

Telephone
(707) 443-6371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502


Project Name
Hiller Lift Station Upgrades

Bid/Contract #
--

Awarding Agency
McKinleyville CSD

Project Location
McKinleyville, Humboldt County, CA

Bid Date
03/04/2020 at 3:30

Project Details
The work for this project generally includes, but is not limited to, furnishing all labor, materials, equipment, and supervision required for the following: removing equipment from the existing lift station and demolishing the existing lift station; installing new submersible pumps in the existing wet well and integrating these new pumps into the District's existing collection system, digital controls, and electrical system; installing new electrical and control conduits and panels; installing new pipes, valves and other appurtenances; connecting to the existing sewer force main; and other associated site improvements as outlined in the Contract Documents.
Demolition and Site Preparation
Wet Well Pumps, Piping, and Hardware
Yard Piping, Valves, and Appurtenances
Precast Traffic-Rated Concrete Valve Vault with Access Hatch (5.5' x 7' x 4.5' deep)
Precast Traffic-Rated Box with Lid (30" x 48")
Erosion Control and Site Restoration
Wet Well Lid and Access Hatch System
Concrete Slab for Electrical Enclosure
Electrical and Controls Systems
Flow Meter, Transmitter, Box, and Associated Controls Integration
Line Interior of Wet Well

Mercer-Fraser Company is an Equal Opportunity Employer. Mercer-Fraser Company is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided for obtain bonding, lines of credit, insurance, necessary equipment, supplies, materials and to break-up items to economically feasible packages for subcontractors and material suppliers. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

How to get in touch


Outreach Coordinator
Cassie Coppini

Project Estimator
Mark Benzinger

Telephone
(707) 443-6371

Fax
(707) 443-0277

Address
P.O. Box 1006
Eureka, CA 95502