Is seeking qualified DBEs, MBEs, WBEs
Outreach Coordinator
Cassie Coppini
Project Estimator
Mark Benzinger
Telephone
(707) 443-6371
Fax
(707) 443-0277
Address
P.O. Box 1006
Eureka, CA 95502
Project Name
Summit Area Improvements
Bid/Contract #
--
Awarding Agency
Cobb Area County Water District
Project Location
Cobb, Lake County, CA
Bid Date
02/28/2020 at 02:00
Project Details
6-Inch and 8-Inch Water Main (Type B Trench)
8-Inch Water Main (Type A Trench)
6-Inch Water Main (Type A Trench)
2-Inch Water Main (Type A Trench)
2-Inch Water Main (Type B Trench)
6-Inch Gate Valve
2-Inch Gate Valve
Fire Hydrant
Bollard
Blow-Off
1 - Inch Water Service Lateral
1-1/2 - Inch Water Service Lateral
Type 1 Water Service
Type 2 Water Service
Type 2 Water Service
Type 4 Water Service
Type 5 Water Service
Connect New Water Service Lateral To Existing Main
2-Inch Water Main Connection
Water Main Connection
Cut In 6-Inch Gate Valve
Cut And Cap Existing Main
Silt Fence
Creek Crossing
Pressure Reducing Valve Station
Trench Through Stump
Remove Existing Tee
Abandon Gate Valve Or Blow-Off
Abandon Wharf Hydrant
Sheeting And Shoring
Mercer-Fraser Company is an Equal Opportunity Employer. Mercer-Fraser Company is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided for obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
How to get in touch
Outreach Coordinator
Cassie Coppini
Project Estimator
Mark Benzinger
Telephone
(707) 443-6371
Fax
(707) 443-0277
Address
P.O. Box 1006
Eureka, CA 95502