DBEGoodFaith.com


Bridgeway Civil Constructors, Inc.

Is seeking qualified DBEs



Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688


Project Name
Construction on State Highway in Butte County near Pulga-Remove Culverts, Construct Bridge and HMA Paving

Bid/Contract #
02-0H9004

Awarding Agency
State of California, Department of Transportation

Project Location
Pulga, Butte County, CA

Bid Date
02/25/2020 at 02:00

Project Details
Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:
LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY TRAFFIC STRIPE (TAPE), TEMPORARY PAVEMENT MARKING (TAPE), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), RELOCATE TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, TEMPORARY TRAFFIC SCREEN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY CHECK DAM, TEMPORARY FIBER ROLL, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, ASBESTOS COMPLIANCE PLAN, INVASIVE SPECIES CONTROL, DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS), CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (DETOUR), ROADWAY EXCAVATION (DETOUR REMOVAL), CHANNEL EXCAVATION, SHOULDER BACKING, STRUCTURE EXCAVATION (BRIDGE), STRUCTURE BACKFILL (BRIDGE), PERVIOUS BACKFILL MATERIAL, INSTALL BRONZE PLAQUE, COMPOST SOCK, HYDROSEED (HBGM), HYDROMULCH (FRM), SOIL TESTING, CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, RAIL ELEMENT WALL, TEMPORARY BRIDGE (STRUCTURE EXCAVATION), TEMPORARY BRIDGE (STRUCTURE BACKFILL), TEMPORARY BRIDGE (GRS FACING ELEMENT), TEMPORARY BRIDGE (GEOSYNTHETIC REINFORCEMENT), TEMPORARY BRIDGE (HOT MIX ASPHALT, BRIDGE), TEMPORARY BRIDGE (FURNISH STRUCTURAL STEEL), TEMPORARY BRIDGE (ERECT STRUCTURAL STEEL), TEMPORARY BRIDGE (UNTREATED LUMBER AND TIMBER), TEMPORARY BRIDGE (BRIDGE REMOVAL), STRUCTURAL CONCRETE, BRIDGE FOOTING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER), STRUCTURAL CONCRETE, HEADWALL, MINOR CONCRETE (BACKFILL), RANDOM ROUGH STACKED ROCK TEXTURE, ARCHITECTURAL TREATMENT (HEADWALL), FURNISH PRECAST PRESTRESSED CONCRETE GIRDER (80'-90'), ERECT PRECAST PRESTRESSED CONCRETE GIRDER, JOINT SEAL (MR 1/2"), BAR REINFORCING STEEL (BRIDGE), BAR REINFORCING STEEL (HEADWALL), BAR REINFORCING STEEL (EPOXY COATED) (BRIDGE), PUBLIC SAFETY PLAN, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, REMOVE CULVERT (LF), REMOVE HEADWALL, REMOVE BOX CULVERT, ROCK SLOPE PROTECTION (STREAMBED TYPE A), ROCK SLOPE PROTECTION (STREAMBED TYPE B), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROOT WAD, TREE CROWN, ROCK SLOPE PROTECTION FABRIC (CLASS 10), MISCELLANEOUS METAL (BRIDGE), PREPARE AND STAIN CONCRETE, PREPARE AND STAIN CONCRETE (HEADWALL), STAIN GALVANIZED SURFACES (LS), REMOVE PAVEMENT MARKER, DELINEATOR (CLASS 1), PAVEMENT MARKER (RETROREFLECTIVE- RECESSED), MILEPOST MARKER, OBJECT MARKER (TYPE L), REMOVE ROADSIDE SIGN (METAL POST), RESET ROADSIDE SIGN (METAL POST), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, FURNISH SINGLE SHEET ALUMINUM SIGN FOR RETROREFLECTIVE SHEETING (TYPE XI) (0.080"-FRAMED), RETROREFLECTIVE SHEETING (TYPE XI), MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), RECESSED ROCK ANCHOR, ALTERNATIVE IN-LINE TERMINAL SYSTEM, CALIFORNIA ST-70 BRIDGE RAIL (MODIFIED), THERMOPLASTIC PAVEMENT MARKING, THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), REMOVE THERMOPLASTIC TRAFFIC STRIPE, PORTABLE TEMPORARY SIGNAL SYSTEMS, MODIFYING TRAFFIC MONITORING STATIONS, MOBILIZATION

All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.
Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Bridgeway's requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.

How to get in touch


Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688