The Third Ave Culvert (LOP 208) is located where the culvert crosses under, where the road crosses over an unnamed creek on Third Ave at the east side of downtown Napa, Napa County.
The Third Ave Bridge (LOP 209) repair project is located at MPM 1.75 where the bridge crosses under an unnamed creek located on Third Ave at the east side of downtown Napa, Napa County. Contractor shall possess a Class A license at the time of contract award. The Engineer's estimate for LOP 208 and LOP 209 is $345,300. The DBE goal is 12%.
The Bid Documents are available, for a fee of ten ($10) per CD, which fee is not refundable. The Bidders bond is required when submitting bids but the Performance, Labor and Material bond is required when contract is awarded.
https://www.countyofnapa.org/2736/Third-Ave-Culvert-Bridge-RDS-17-32-17-33
Addendums will be posted in the link.