DBEGoodFaith.com


Bridgeway Civil Constructors, Inc.

Is seeking qualified DVBEs



Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688


Project Name
For Construction on State Highway 80 in Solano County in Vallejo at Various Locations

Bid/Contract #
04-0J7104

Awarding Agency
State of California, Department of Transportation

Project Location
Vallejo, Solano County, CA

Bid Date
02/27/2020 at 14:00

Project Details
Bridgeway Civil Constructors, Inc. (Bridgeway) is preparing to bid the project below as a JOINT VENTURE with Ghilotti Brothers.
Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:
LEAD COMPLIANCE PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (WDAY), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), TEMPORARY PAVEMENT MARKER (RETROREFLECTIVE), TEMPORARY SHUTTLE SERVICE, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, TEMPORARY ALTERNATIVE CRASH CUSHION, TEMPORARY TRAFFIC SCREEN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, NOISE MONITORING, REMOVE BIRD DROPPINGS, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), STRUCTURE EXCAVATION (BRIDGE), STRUCTURE BACKFILL (BRIDGE), DITCH EXCAVATION, IMPORTED BORROW (CY), SUBGRADE ENHANCEMENT GEOTEXTILE, CLASS B1, GEOGRID EMBANKMENT REINFORCEMENT, ROADSIDE CLEARING, ROCK BLANKET, SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP U), PLANT ESTABLISHMENT WORK, WOOD MULCH, 2" WYE STRAINER ASSEMBLY, 2" SUPPLY LINE (BRIDGE), TREE WELL SPRINKLER ASSEMBLY, CAM COUPLER ASSEMBLY, 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), BALL VALVE, IMPORTED TOPSOIL (CY), ROLLED EROSION CONTROL PRODUCT (NETTING), ROLLED EROSION CONTROL PRODUCT (BLANKET), HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST (CY), INCORPORATE MATERIALS, CLASS 2 AGGREGATE SUBBASE, CLASS 2 AGGREGATE BASE (CY), CRACK TREATMENT, REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED), HOT MIX ASPHALT (BRIDGE), ASPHALT BINDER (GEOSYNTHETIC PAVEMENT INTERLAYER), GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING GRID), DATA CORE, PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE F), TACK COAT, REMOVE HMA SIDEWALK, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, JOINTED PLAIN CONCRETE PAVEMENT, DRILL AND BOND (DOWEL BAR), RAISE BRIDGE (LOCATION A), RAISE BRIDGE (LOCATION B), RAISE BRIDGE (LOCATION C), RAISE BRIDGE (LOCATION D), RAISE BRIDGE (LOCATION E), RAISE BRIDGE (LOCATION F), STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R MODIFIED), STRUCTURAL CONCRETE, DRAINAGE INLET, DRILL AND BOND DOWEL, CLEAN EXPANSION JOINT, ELASTOMERIC BEARING PAD, JOINT SEAL (MR 1/2"), JOINT SEAL (ASPHALTIC PLUG), BAR REINFORCING STEEL (BRIDGE), RECONSTRUCT BRIDGE MOUNTED SIGN, REMOVE BRIDGE MOUNTED SIGN, CORE AND PRESSURE GROUT DOWEL, RAPID SETTING CONCRETE (PATCH), REMOVE ASPHALT CONCRETE SURFACING, REMOVE UNSOUND CONCRETE, PREPARE CONCRETE BRIDGE DECK SURFACE, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION), LOCATION B, BRIDGE REMOVAL (PORTION), LOCATION C, BRIDGE REMOVAL (PORTION), LOCATION D, BRIDGE REMOVAL (PORTION), LOCATION E, BRIDGE REMOVAL (PORTION), LOCATION F, MISCELLANEOUS METAL (RESTRAINER-CABLE TYPE MODIFIED), 18" ALTERNATIVE PIPE CULVERT, 12" CORRUGATED STEEL PIPE DOWNDRAIN, 12" ENTRANCE TAPER, 12" ANCHOR ASSEMBLY, DRAINAGE INLET MARKER, 36" CORRUGATED STEEL PIPE INLET (.079" THICK), 12" STEEL FLARED END SECTION, REMOVE OVERSIDE DRAIN, REMOVE CULVERT (LF), REMOVE INLET, SLOPE PAVING (CONCRETE), SLOPE PAVING (CONCRETE PAVERS), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (20LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (CURB) (CY), MINOR CONCRETE (CURB AND GUTTER), MINOR CONCRETE (ISLAND PAVING), MINOR CONCRETE (TEXTURED CONCRETE MEDIAN), MINOR CONCRETE (SIDEWALK), MINOR CONCRETE (TEXTURED PAVING), REMOVE CONCRETE CURB (LF), REMOVE CONCRETE SIDEWALK (SQYD), REMOVE CONCRETE ISLAND (PORTIONS) (CY), REMOVE CONCRETE (CURB AND GUTTER), MISCELLANEOUS IRON AND STEEL, MISCELLANEOUS METAL (BRIDGE), TEMPORARY FENCE (TYPE CL-6), CHAIN LINK FENCE (TYPE CL-4), CHAIN LINK FENCE (TYPE CL-6) 4' CHAIN LINK GATE (TYPE CL-4), REMOVE FENCE, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), OBJECT MARKER (TYPE P), SPECIAL MARKER, REMOVE ROADSIDE SIGN MOUNTED ON MAST ARM, REMOVE ROADSIDE SIGN, REMOVE SIGN PANEL FROM STRUCTURE, FURNISH FORMED PANEL SIGN (OVERHEAD) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH LAMINATED PANEL SIGN (1" - TYPE A) FOR RETROREFLECTIVE SHEETING (TYPE XI), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" - UNFRAMED) FOR RETROFLECTIVE SHEETING (TYPE XI), "FURNISH SINGLE SHEET ALMINUM SIGN (0.080""- UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI)", RETROREFLECTIVE SHEETING (TYPE XI), ROADSIDE SIGN - ONE POST, INSTALL SIGN (MAST-ARM HANGER METHOD), INSTALL SIGN PANEL ON EXISTING FRAME, INSTALL SIGN PANEL ON EXISTING STRUCTURE, MIDWEST GUARDRAIL SYSTEM (7' WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), CHAIN LINK RAILING (TYPE 7), DOUBLE THRIE BEAM BARRIER, TRANSITION RAILING (TYPE WB-31), END CAP (TYPE A), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 60MS), CONCRETE BARRIER (732SW MODIFIED), CONCRETE BARRIER (TYPE 732SW), CONCRETE BARRIER (TYPE 836A MODIFIED), CONCRETE BARRIER (TYPE 836 MODIFIED), REMOVE GUARDRAIL, RECONSTRUCT CHAIN LINK RAILING, RESET CRASH CUSHION, REMOVE CONCRETE BARRIER, SALVAGE CRASH CUSHION, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, 2" CONDUIT (BRIDGE), MODIFYING EXISTING ELECTRICAL SYSTEM, MOBILIZATION

All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.

Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Bridgeway's requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.

How to get in touch


Outreach Coordinator
Barbara Sasser

Project Estimator
Gabe Farncroft gfarncroft@bridgewaycci.com

Telephone
(707) 455-7033

Fax
(707) 455-7036

Address
3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688